[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"project-validierung-von-geraeten":3,"similar-validierung-von-geraeten":33},{"id":4,"slug":5,"title":6,"skills":7,"budget":17,"duration":18,"location":19,"onsitePercent":20,"contractType":21,"foundAt":22,"category":23,"description":27,"rawText":28,"webTitle":6,"webText":29,"language":30,"projectId":31,"sourceUrl":32},7281,"validierung-von-geraeten","Validierung von Geräten",[8,9,10,11,12,13,14,15,16],"Testing","Validierung","Versuch","Thermik","Elektrik","Mechanik","Mess- und Prüfmethoden","Analyse","Dokumentation",null,"7 Monate","Wörgl",100,"contracting","2026-06-01T12:26:35+00:00",{"id":24,"slug":25,"label":26},9,"mechanical","Maschinenbau & Konstruktion","Durchführung und Auswertung von Validierungs- und Testreihen für Geräte. Planung und Umsetzung von mechanischen sowie Dauerlauf- und Lebensdauertests. Analyse der Leistungsaufnahme und Produkteigenschaften unter verschiedenen Bedingungen.","Validierung von Geräten\nProjektnummer: FE94-58440-INN\nStandort: Wörgl, Tirol\nArbeitsweise: Vor Ort\nLaufzeit: 7 Monate\nStartdatum: 15.06.2026\n\nLeistungsbeschreibung:\n- Durchführung und Auswertung von Validierungs- und Testreihen (Temperatur, Elektrik, Performance)\n\n- Planung und Umsetzung von mechanischen sowie Dauerlauf- und Lebensdauertests\n\n- Analyse der Leistungsaufnahme und Produkteigenschaften unter verschiedenen Bedingungen (z. B. Klimakammer)\n\n- Mitwirkung bei Prototypen, Optimierungen und technischer Dokumentation\n\nAnforderungen:\n- Erfahrung in Testing, Validierung und Versuch\n\n- Technisches Verständnis (Thermik, Elektrik oder Mechanik)\n\n- Praxis im Umgang mit Mess- und Prüfmethoden\n\n- Hands-on Mentalität und strukturierte Arbeitsweise\n\nSkills: Analyse, Arbeitsweise, Auswertung, Dauerlauf, Dokumentation, Elektrik, Mechanik, Planung, Testing, Umsetzung, Validierung, Versuch\n\nAnsprechpartner:\nSelina Bähner\nFreelance Acquisition Specialist\nFERCHAU Austria GmbH, Niederlassung Innsbruck\nGrabenweg 64\n6020 Innsbruck\n+43 732 210324-15\nselina.baehner@ferchau.com","Für ein spannendes Projekt in Wörgl, Tirol, suchen wir einen erfahrenen Validierungsexperten für eine 7-monatige Vor-Ort-Tätigkeit. Sie übernehmen die Durchführung und Auswertung umfassender Validierungs- und Testreihen in den Bereichen Temperatur, Elektrik und Performance. Ihre Aufgaben umfassen die Planung und Umsetzung mechanischer Tests sowie Dauerlauf- und Lebensdauertests zur Bewertung der Produktqualität und -zuverlässigkeit. Ein wesentlicher Bestandteil Ihrer Tätigkeit ist die Analyse der Leistungsaufnahme und Produkteigenschaften unter verschiedenen Umgebungsbedingungen, beispielsweise in Klimakammern. Darüber hinaus wirken Sie aktiv bei der Entwicklung von Prototypen mit, unterstützen Optimierungsprozesse und erstellen die entsprechende technische Dokumentation. Wir erwarten fundierte Erfahrung in Testing, Validierung und Versuchsdurchführung sowie ein ausgeprägtes technisches Verständnis in mindestens einem der Bereiche Thermik, Elektrik oder Mechanik. Praktische Kenntnisse im Umgang mit modernen Mess- und Prüfmethoden sind ebenso erforderlich wie eine hands-on Mentalität und eine strukturierte, systematische Arbeitsweise. Diese Position bietet Ihnen die Möglichkeit, in einem innovativen Umfeld zu arbeiten und maßgeblich zur Produktentwicklung beizutragen. Sie arbeiten eigenverantwortlich und bringen Ihre Expertise in einem dynamischen Team ein, das höchste Qualitätsstandards verfolgt.","de","FE94-58440-INN","https:\u002F\u002Ftouch.ferchau.com\u002Fde\u002Fde\u002Fprojekt\u002F507109",{"items":34},[35,52,67,80,101,121,137,148,167,184,199,213,228,242,255],{"id":36,"slug":37,"title":38,"skills":39,"budget":17,"duration":47,"location":48,"onsitePercent":20,"contractType":49,"foundAt":50,"category":51},7295,"monteur-mechanik-elektronik-optik-messtechnik","Monteur – Mechanik \u002F Elektronik \u002F Optik \u002F Messtechnik",[13,40,41,42,43,44,45,46],"Elektronik","Optik","Messtechnik","MS-Office","Excel","SAP","Deutsch C1\u002FC2","12+ Monate ab 01.06.2026","Heerbrugg, St. Gallen","temp_work","2026-06-01T13:06:57+00:00",{"id":24,"slug":25,"label":26},{"id":53,"slug":54,"title":55,"skills":56,"budget":17,"duration":17,"location":63,"onsitePercent":64,"contractType":21,"foundAt":65,"category":66},7242,"cad-systembetreuer-mwd","CAD Systembetreuer (m\u002Fw\u002Fd)",[57,58,59,60,61,62],"3D-CAD","PLM","SAP PLM ECTR","Anlagenbau","Scripting","Informatik","Linz",50,"2026-06-01T10:25:32+00:00",{"id":24,"slug":25,"label":26},{"id":68,"slug":69,"title":70,"skills":71,"budget":17,"duration":17,"location":77,"onsitePercent":64,"contractType":49,"foundAt":78,"category":79},7220,"maschinenmechaniker-mwd","Maschinenmechaniker (m\u002Fw\u002Fd)",[72,73,74,75,76],"Maschinenmechanik","Vormontage","Qualitätskontrolle","Inbetriebnahme","Maschinenkomponenten","Rohrdorf","2026-06-01T09:26:44+00:00",{"id":24,"slug":25,"label":26},{"id":81,"slug":82,"title":83,"skills":84,"budget":17,"duration":97,"location":98,"onsitePercent":20,"contractType":21,"foundAt":99,"category":100},7216,"planungsingenieur-rohrleitungs-und-anlagentechnik-mwd","Planungsingenieur Rohrleitungs- und Anlagentechnik (m\u002Fw\u002Fd)",[85,86,87,88,89,90,91,92,93,94,95,96],"Anlagentechnik","Armaturen","Auslegung","AutoCAD","Berechnung","Kraftwerksanlagen","Machbarkeitsstudien","Planung","Regelungstechnik","Rohrleitungsplanung","Thermodynamik","Plant 3D","13 Monate","Berlin","2026-06-01T09:25:46+00:00",{"id":24,"slug":25,"label":26},{"id":102,"slug":103,"title":104,"skills":105,"budget":17,"duration":17,"location":118,"onsitePercent":64,"contractType":21,"foundAt":119,"category":120},7197,"ingenieur-schiffbau-mwd","Ingenieur Schiffbau (m\u002Fw\u002Fd)",[106,107,87,108,109,110,111,112,113,114,115,116,117],"Schiffbau","Konstruktion","FEM","CAD","Aveva Marine","Ansys","Poseidon","Hyperworks","Stahlbau","DNV","DIN","Marinevorschriften","Emden","2026-06-01T08:27:00+00:00",{"id":24,"slug":25,"label":26},{"id":122,"slug":123,"title":124,"skills":125,"budget":17,"duration":17,"location":134,"onsitePercent":20,"contractType":49,"foundAt":135,"category":136},7194,"mitarbeiter-mwd-5s-siemens-energy-global-gmbh-co-kg","Mitarbeiter (m\u002Fw\u002Fd) 5S - Siemens Energy Global GmbH & Co. KG",[126,127,128,129,130,131,132,133,16],"5S","Industriemechaniker","Fertigung","Lean Management","Kranschein G25","Hubwagen","Kontinuierliche Verbesserung","Teamfähigkeit","Mülheim","2026-06-01T08:26:11+00:00",{"id":24,"slug":25,"label":26},{"id":138,"slug":139,"title":140,"skills":141,"budget":17,"duration":17,"location":118,"onsitePercent":64,"contractType":21,"foundAt":146,"category":147},7164,"berechnungsingenieur-schiffstechnik-mwd","Berechnungsingenieur Schiffstechnik (m\u002Fw\u002Fd)",[106,142,108,113,111,143,112,144,145,107,15],"Festigkeitsberechnung","RFEM","Nauticus","MS Office","2026-06-01T07:25:50+00:00",{"id":24,"slug":25,"label":26},{"id":149,"slug":150,"title":151,"skills":152,"budget":17,"duration":17,"location":164,"onsitePercent":20,"contractType":21,"foundAt":165,"category":166},7152,"entwicklungsingenieur-mwd-maschinenbau-2","Entwicklungsingenieur (m\u002Fw\u002Fd) Maschinenbau",[153,154,155,156,157,109,158,159,45,160,161,162,163],"Maschinenbau","Mechatronik","Industrial Engineering","REFA","MTM","CREO","Lean Manufacturing","Ergonomie","Simulationssoftware","Siemens Tecnomatix","KVP","Bruchsal","2026-06-01T06:25:46+00:00",{"id":24,"slug":25,"label":26},{"id":168,"slug":169,"title":170,"skills":171,"budget":17,"duration":17,"location":164,"onsitePercent":20,"contractType":21,"foundAt":182,"category":183},7151,"supply-chain-manager-mwd-sondermaschinenbau","Supply Chain Manager (m\u002Fw\u002Fd) Sondermaschinenbau",[172,45,173,44,174,175,176,177,178,179,180,181],"Supply Chain Management","ERP","Disposition","Produktionsplanung","Einkauf","Logistik","Eskalationsmanagement","Prozessoptimierung","Betriebswirtschaft","Sondermaschinenbau","2026-06-01T06:25:33+00:00",{"id":24,"slug":25,"label":26},{"id":185,"slug":186,"title":187,"skills":188,"budget":17,"duration":17,"location":195,"onsitePercent":20,"contractType":196,"foundAt":197,"category":198},7130,"servicetechniker-mwd-2","Servicetechniker (m\u002Fw\u002Fd)",[189,127,190,75,191,192,193,194],"Mechatroniker","Elektroniker","Anlagen","SPS","Englischkenntnisse","PC-Anwendungen","Paderborn","permanent","2026-06-01T02:27:49+00:00",{"id":24,"slug":25,"label":26},{"id":200,"slug":201,"title":202,"skills":203,"budget":17,"duration":17,"location":210,"onsitePercent":20,"contractType":21,"foundAt":211,"category":212},7129,"industrial-engineer-mwd-3","Industrial Engineer (m\u002Fw\u002Fd)",[204,153,205,206,207,208,209],"Elektrotechnik","Produktion","Qualifizierung","Wirtschaftlichkeitsberechnungen","IATF","Projektmanagement","Detmold","2026-06-01T02:27:37+00:00",{"id":24,"slug":25,"label":26},{"id":214,"slug":215,"title":216,"skills":217,"budget":17,"duration":17,"location":195,"onsitePercent":20,"contractType":21,"foundAt":226,"category":227},7128,"versuchsingenieur-antriebstechnik-mwd","Versuchsingenieur Antriebstechnik (m\u002Fw\u002Fd)",[153,154,204,218,219,220,221,222,223,224,225],"Hydraulik","Automatisierungstechnik","LabVIEW","DIAdem","Sensorik","Antriebstechnik","Landmaschinen","Schädigungsanalyse","2026-06-01T02:27:23+00:00",{"id":24,"slug":25,"label":26},{"id":229,"slug":230,"title":231,"skills":232,"budget":17,"duration":17,"location":195,"onsitePercent":20,"contractType":21,"foundAt":240,"category":241},7124,"projektleiter-maschinenbau-mwd","Projektleiter Maschinenbau (m\u002Fw\u002Fd)",[233,234,235,153,92,236,209,237,238,239],"Führung","Kalkulation","Management","Projektleiter","Projektplanung","Projektsteuerung","Steuerung","2026-06-01T02:26:27+00:00",{"id":24,"slug":25,"label":26},{"id":243,"slug":244,"title":245,"skills":246,"budget":17,"duration":17,"location":195,"onsitePercent":64,"contractType":21,"foundAt":253,"category":254},7123,"konstrukteur-maschinenbau-mwd-4","Konstrukteur Maschinenbau (m\u002Fw\u002Fd)",[153,109,247,248,249,250,251,252],"Siemens NX","Catia V5","Inventor","3D-Konstruktion","Werkstoffkunde","Fertigungsgerechte Konstruktion","2026-06-01T02:26:14+00:00",{"id":24,"slug":25,"label":26},{"id":256,"slug":257,"title":258,"skills":259,"budget":17,"duration":17,"location":265,"onsitePercent":20,"contractType":21,"foundAt":266,"category":267},7099,"arbeitsvorbereiter-mwd-2","Arbeitsvorbereiter (m\u002Fw\u002Fd)",[260,261,109,173,262,145,153,263,175,264],"Arbeitsvorbereitung","Betriebsmittel","Fertigungssteuerung","Montage","Qualitätssicherung","Hennigsdorf bei Berlin","2026-05-31T02:28:26+00:00",{"id":24,"slug":25,"label":26}]