[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"project-technischer-projektcontrollermengenermittler-2":3,"similar-technischer-projektcontrollermengenermittler-2":36},{"id":4,"slug":5,"title":6,"skills":7,"budget":19,"duration":20,"location":21,"onsitePercent":22,"contractType":23,"foundAt":24,"category":25,"description":29,"rawText":30,"webTitle":31,"webText":32,"language":33,"projectId":34,"sourceUrl":35},12931,"technischer-projektcontrollermengenermittler-2","Technischer Projektcontroller\u002FMengenermittler",[8,9,10,11,12,13,14,15,16,17,18],"Abrechnung","Mengenermittlung","Rechnungsprüfung","Bauleitung","Ingenieur oder Techniker (Bau\u002FElektrotechnik)","Freileitungsbau","RIB iTWO","GAEB-Dateien","VOB\u002FC","Selbstorganisation","Teamfähigkeit",null,"24 Monate","Karlsruhe",60,"contracting","2026-06-15T12:30:25+00:00",{"id":26,"slug":27,"label":28},12,"construction","Bauwesen & Architektur","Gesucht wird ein Technischer Projektcontroller\u002FMengenermittler für einen Freileitungsbau-Kunden. Die Person ist 2026 an drei Tagen pro Woche tätig, ab 2027 vier Tage, ab Mitte 2027 Vollzeit. Aufgaben umfassen Abrechnung, Mengenermittlung, Nachtragsbearbeitung und Rechnungsprüfung.","Aktuell sind wir für einen unserer Kunden auf der Suche nach einem Technischen Projektcontroller\u002FMengenermittler.\n\nEs wird eine Person zur Erbringung der Leistung gesucht, die im Jahr 2026 an drei Tagen pro Woche zur Verfügung steht. Ab 2027 ist eine Erhöhung auf vier Tage pro Woche vorgesehen, mit einer Ausweitung auf eine Vollzeittätigkeit (1 FTE) ab Mitte 2027.\n\nFolgende Aufgaben erwarten Sie: \n\n+ Verantwortet die korrekte Abrechnung erbrachter Mengen und Leistungen\n\n+ Ergänzt die Abrechnung mit Nachträgen und Claims zur Nachverfolgung der Kosten\n\n+ Verantwortet die fachliche Prüfung von Nachträgen und Claims.\n\n+ Stimmt sich eng mit den Erstellern der Nachweise (Stundennachweise, Pläne\u002FZeichnungen, Lieferscheine, Abnahmeprotokolle, Aufmaß-Formblätter, Rechnungsnachweise Subunternehmer, etc.) für die Rechnungsstellung ab\n\n+ Stimmt sich bei Nachträgen und Claims eng mit dem betreffenden Dienstleister und den verantwortlichen Schnittstellen (Los Verantwortlichen, Projektsteuerer, BauKo.\n\n+ Stimmt sich eng mit den internen „Schnittstellen“ ab (Cost Engineer und Los Verantwortlicher)\n\n+ Prüft und ggf. begleitet bei Bedarf die Erstellung der Nachweise auf formale und inhaltliche Richtigkeit und leitet Überarbeitungen ein\n\n+ Bei Bedarf selbstverantwortliche Erstellung von Nachweisen mit dem Bau-GU in Vertretung der verantwortlichen Rollen\n\n+ Prüft die eingereichten Anlagen zur Rechnung (Tagelohnzettel, Aufmaße, Lieferscheine, Massenermittlungen, Pläne, sonstige Nachweise) inhaltlich, auf Vollzähligkeit und auf Richtigkeit\n\n+ Prüft Nachweise, Massenermittlung und die Rechnungen im Hinblick auf den Vertrag, das Leistungsverzeichnis und VOB\u002FC\n\n+ Prüft die Rechtmäßigkeit, Nachvollziehbarkeit und Kalkulation von Nachträgen unter Berücksichtigung des Auftrages und des Leistungsverzeichnisses \n\n+ Erstellt intern einen kleinen wöchentlichen Bericht über die Entwicklung der Tätigkeit, Vorgänge, Probleme, Verbesserungen etc.\n\n Anforderungen: \n Must-have:\n\n+ Erfahrung als Abrechner\u002FMengenermittler\u002FRechnungsprüfer\u002FBauleiter\n\n+ Qualifikation als Ingenieur oder Techniker (Bau oder Elektrotechnik) \n\n+ Erfahrung im Freileitungsbau\n\n+ Erfahrung mit RIB iTWO & im Umgang mit GAEB-Dateien\n\n+ gute Selbstorganisation, eigenständiges Arbeiten \n\n+ gute Kommunikation und Zusammenarbeit im Team\n\n+ Reisebereitschaft (Einsatzort bei Präsenz: Karlsruhe (ca. 3 Tage\u002FWoche))\n\n Zusätzliche Informationen: \n Konnten wir Ihr Interesse wecken? Dann freuen wir uns auf die Zusendung Ihres aussagekräftigen Expertenprofils unter Angabe Ihrer Stundensatzvorstellung. \n\n Projekt-Nr.: \n106468\n\nStellentyp: \nfreiberuflich\n\nEinsatzort: \nD7, Remote\n\nStart: \nasap\n\nDauer: \n24 Monate+++","Technischer Projektcontroller \u002F Mengenermittler (m\u002Fw\u002Fd)","Wir suchen einen erfahrenen Technischen Projektcontroller \u002F Mengenermittler für ein Infrastrukturprojekt im Bereich Freileitungsbau. Die Position ist als freiberufliche Tätigkeit ausgeschrieben und startet zeitnah mit einer Laufzeit von etwa 24 Monaten.\n\nIm Jahr 2026 werden Sie an drei Tagen pro Woche tätig sein, ab 2027 erfolgt eine Ausweitung auf vier Tage pro Woche und ab Mitte 2027 auf eine Vollzeittätigkeit (1 FTE).\n\nAufgabenschwerpunkte:\n- Verantwortung für die korrekte Abrechnung erbrachter Mengen und Leistungen\n- Fachliche Prüfung von Nachträgen und Claims sowie deren Nachverfolgung\n- Enge Abstimmung mit Nachweiserstellern (Stundennachweise, Pläne, Lieferscheine, Aufmaße, etc.)\n- Koordination mit Dienstleistern und internen Schnittstellen\n- Prüfung eingereicherter Anlagen auf formale und inhaltliche Richtigkeit\n- Überprüfung von Nachweisen, Massenermittlungen und Rechnungen gegen Vertrag und Leistungsverzeichnis\n- Bewertung der Rechtmäßigkeit und Nachvollziehbarkeit von Nachträgen\n- Erstellung wöchentlicher Berichte zur Tätigkeitsentwicklung\n\nAnforderungen:\n- Nachgewiesene Erfahrung als Abrechner, Mengenermittler, Rechnungsprüfer oder Bauleiter\n- Qualifikation als Ingenieur oder Techniker (Bau oder Elektrotechnik)\n- Fundierte Kenntnisse im Freileitungsbau\n- Sicherer Umgang mit RIB iTWO und GAEB-Dateien\n- Eigenständiges Arbeiten und gute Selbstorganisation\n- Teamfähigkeit und kommunikative Stärke\n- Reisebereitschaft (Einsatzort mit Präsenzanteilen, ca. 3 Tage\u002FWoche)\n\nWir freuen uns auf Ihre Bewerbung mit aussagekräftigem Profil und Stundensatzvorstellung.","de","106468","https:\u002F\u002Fwww.solcom.de\u002Fde\u002Fprojektportal\u002Fprojektangebote\u002Ftechnischer-projektcontroller-mengenermittler-m-w-d-106468?utm_source=RSS&utm_medium=RSS&utm_campaign=RSS-Feed",{"items":37},[38,57,73,88,105,117,133,153,171,182,198,214,223,230,237],{"id":39,"slug":40,"title":41,"skills":42,"budget":51,"duration":19,"location":52,"onsitePercent":53,"contractType":54,"foundAt":55,"category":56},13014,"all-round-servicemonteur-spoorinfrastructuur","All-round Servicemonteur Spoorinfrastructuur",[43,44,45,46,47,48,49,50],"Elektrotechniek","Werktuigbouwkunde","Mechanica","Civiele techniek","Wisselsystemen","Seinwezen-installaties","Storingsbeheer","Technisch onderhoud","€3.500-€4.800 bruto\u002FMonat","Nederland",100,"permanent","2026-06-15T16:01:48+00:00",{"id":26,"slug":27,"label":28},{"id":58,"slug":59,"title":60,"skills":61,"budget":19,"duration":69,"location":70,"onsitePercent":53,"contractType":23,"foundAt":71,"category":72},13009,"bauleiter-stahlbetonbau-schwerindustrie","Bauleiter Stahlbetonbau Schwerindustrie",[11,62,63,64,65,66,67,68],"Stahlbetonbau","Massivbau","Civil Engineering","Schwerindustrie","Arbeitssicherheit","Projektkoordination","Betontechnologie","2 Jahre +","Dillingen","2026-06-15T15:30:42+00:00",{"id":26,"slug":27,"label":28},{"id":74,"slug":75,"title":76,"skills":77,"budget":19,"duration":19,"location":85,"onsitePercent":53,"contractType":54,"foundAt":86,"category":87},12999,"fachkraft-arbeitssicherheit-mwd","Fachkraft Arbeitssicherheit (m\u002Fw\u002Fd)",[66,78,79,80,81,82,83,84],"Arbeitsrecht","Gefährdungsbeurteilungen","DGUV","Arbeitsschutzmanagementsysteme","SCC","Audits","Dokumentation","Amt Wachsenburg, Thüringen","2026-06-15T15:27:24+00:00",{"id":26,"slug":27,"label":28},{"id":89,"slug":90,"title":91,"skills":92,"budget":19,"duration":19,"location":101,"onsitePercent":102,"contractType":54,"foundAt":103,"category":104},12992,"bauingenieur-mwd-innovative-baustoffe-tragwerksplanung-in-direktvermittlung","Bauingenieur (m\u002Fw\u002Fd) - innovative Baustoffe & Tragwerksplanung in Direktvermittlung",[93,94,95,96,97,98,99,100],"Bauingenieurwesen","Tragwerksplanung","Hochbau","Projektleitung","Planung","Steuerung","Kostenmanagement","Qualitätssicherung","Dresden",50,"2026-06-15T15:26:30+00:00",{"id":26,"slug":27,"label":28},{"id":106,"slug":107,"title":108,"skills":109,"budget":19,"duration":19,"location":101,"onsitePercent":102,"contractType":54,"foundAt":115,"category":116},12991,"teamleiter-tragwerksplanung-mwd-in-direktvermittlung","Teamleiter Tragwerksplanung (m\u002Fw\u002Fd) in Direktvermittlung",[94,110,111,112,113,93,99,114],"Projektsteuerung","Teamführung","Kalkulation","Projektmanagement","Koordination","2026-06-15T15:26:22+00:00",{"id":26,"slug":27,"label":28},{"id":118,"slug":119,"title":120,"skills":121,"budget":19,"duration":129,"location":130,"onsitePercent":53,"contractType":23,"foundAt":131,"category":132},12980,"projektleiter-linearer-infrastrukturbau","Projektleiter Linearer Infrastrukturbau",[96,99,122,123,124,125,126,127,128],"Terminmanagement","Vertragsmanagement","Qualitätsmanagement","Arbeitsschutz","Erdgaspipelines","Kabelbau","Tiefbau","01.07.2026 bis Ende 2028","Würzburg","2026-06-15T15:10:30+00:00",{"id":26,"slug":27,"label":28},{"id":134,"slug":135,"title":136,"skills":137,"budget":19,"duration":19,"location":150,"onsitePercent":53,"contractType":54,"foundAt":151,"category":152},12972,"design-planning-manager-construction-projects","Design & Planning Manager – Construction Projects",[138,139,140,141,142,143,144,145,146,147,148,149],"Design Coordination","Technical Project Management","Construction Project Delivery","MEP Design Integration","Value Engineering","HOAI Knowledge","VOB Knowledge","AHO Knowledge","German Construction Regulations","Stakeholder Management","German Language (C1)","English Language","Berlin","2026-06-15T14:16:53+00:00",{"id":26,"slug":27,"label":28},{"id":154,"slug":155,"title":156,"skills":157,"budget":19,"duration":19,"location":168,"onsitePercent":53,"contractType":54,"foundAt":169,"category":170},12970,"project-manager-construction-commercial-real-estate-mfd-2","Project Manager Construction – Commercial Real Estate (m\u002Ff\u002Fd)",[158,159,160,161,162,147,163,164,165,166,167],"Project Management","Construction Management","Refurbishment Projects","Fit-out Projects","CAPEX Management","Cost Management","Microsoft Office","German (C1)","English","Architecture\u002FCivil Engineering Knowledge","Düsseldorf, Frankfurt","2026-06-15T14:16:32+00:00",{"id":26,"slug":27,"label":28},{"id":172,"slug":173,"title":156,"skills":174,"budget":19,"duration":19,"location":168,"onsitePercent":53,"contractType":54,"foundAt":180,"category":181},12969,"project-manager-construction-commercial-real-estate-mfd",[113,175,176,99,147,164,177,178,179,93],"Bauwesen","Konstruktion","Deutsch C1","Englisch","Architektur","2026-06-15T14:16:22+00:00",{"id":26,"slug":27,"label":28},{"id":183,"slug":184,"title":185,"skills":186,"budget":19,"duration":194,"location":150,"onsitePercent":195,"contractType":23,"foundAt":196,"category":197},12967,"bauueberwachung-fuer-den-bereich-elektrotechnik-mwd-berlin","Bauüberwachung für den Bereich Elektrotechnik (m\u002Fw\u002Fd) Berlin",[187,188,11,113,189,190,191,192,193],"Elektrotechnik","Bauüberwachung","Bautagebuche","Planradar","Dalux","BIM360","Öffentliche Projekte","9-10 Monate",80,"2026-06-15T14:01:42+00:00",{"id":26,"slug":27,"label":28},{"id":199,"slug":200,"title":201,"skills":202,"budget":19,"duration":209,"location":210,"onsitePercent":211,"contractType":23,"foundAt":212,"category":213},12966,"nachtragsmanager-mwd-gesundheitsbau-in-mannheim","Nachtragsmanager (m\u002Fw\u002Fd) - Gesundheitsbau in Mannheim",[203,204,123,205,206,207,208],"Nachtragsmanagement","Claim Management","Bauverträge","Leistungsverzeichnisse","Einheitspreisabrechnungen","Nachunternehmer-Management","bis November 2026 (mit Option auf Verlängerung)","Mannheim",75,"2026-06-15T14:01:32+00:00",{"id":26,"slug":27,"label":28},{"id":215,"slug":216,"title":217,"skills":218,"budget":19,"duration":19,"location":19,"onsitePercent":19,"contractType":54,"foundAt":221,"category":222},12960,"project-manager-construction-4","Project Manager Construction",[113,175,176,99,219,164,178,220],"Kommunikation","Deutsch","2026-06-15T13:51:50+00:00",{"id":26,"slug":27,"label":28},{"id":224,"slug":225,"title":217,"skills":226,"budget":19,"duration":19,"location":19,"onsitePercent":19,"contractType":54,"foundAt":228,"category":229},12959,"project-manager-construction-3",[113,175,176,99,219,164,178,220,227],"Architektur oder Ingenieurwesen","2026-06-15T13:51:41+00:00",{"id":26,"slug":27,"label":28},{"id":231,"slug":232,"title":217,"skills":233,"budget":19,"duration":19,"location":19,"onsitePercent":19,"contractType":54,"foundAt":235,"category":236},12956,"project-manager-construction-2",[113,175,176,99,219,164,178,220,179,234],"Ingenieurwesen","2026-06-15T13:46:50+00:00",{"id":26,"slug":27,"label":28},{"id":238,"slug":239,"title":217,"skills":240,"budget":19,"duration":19,"location":19,"onsitePercent":19,"contractType":54,"foundAt":241,"category":242},12955,"project-manager-construction",[113,175,176,99,219,164,178,220],"2026-06-15T13:46:41+00:00",{"id":26,"slug":27,"label":28}]