[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"project-technischer-produktdesigner-maschinenbau-mwd-3":3,"similar-technischer-produktdesigner-maschinenbau-mwd-3":32},{"id":4,"slug":5,"title":6,"skills":7,"budget":17,"duration":17,"location":18,"onsitePercent":19,"contractType":20,"foundAt":21,"category":22,"description":26,"rawText":27,"webTitle":6,"webText":28,"language":29,"projectId":30,"sourceUrl":31},5440,"technischer-produktdesigner-maschinenbau-mwd-3","Technischer Produktdesigner Maschinenbau (m\u002Fw\u002Fd)",[8,9,10,11,12,13,14,15,16],"Anlagenbau","CAD","Detaillierung","Dokumentation","Maschinenbau","Optimierung","SAP","Solid Edge","SolidWorks",null,"München",100,"contracting","2026-05-22T12:26:09+00:00",{"id":23,"slug":24,"label":25},9,"mechanical","Maschinenbau & Konstruktion","Erstellung normkonformer technischer Zeichnungen für Baugruppen und Anlagenkomponenten. Durchführung von Detailkonstruktionen und kontinuierliche Optimierung bestehender Baugruppen. Pflege von Konstruktionsunterlagen und Verwaltung von Stücklisten mit SAP.","Technischer Produktdesigner Maschinenbau (m\u002Fw\u002Fd)\nProjektnummer: FE74-72086-F-CO\nStandort: München, Bayern\nArbeitsweise: Vor Ort\nLaufzeit: Keine Angabe\nStartdatum: Keine Angabe\n\nIhr Aufgabengebiet:\n- Erstellung und Ausarbeitung normkonformer technischer Zeichnungen für Baugruppen sowie Anlagenkomponenten\n\n- Durchführung von Detailkonstruktionen sowie kontinuierliche Optimierung und Anpassung bestehender Baugruppen und Einzelteile\n\n- Pflege und Weiterentwicklung von Konstruktionsunterlagen im Rahmen von Änderungsprozessen\n\n- Anfertigung und Verwaltung von Stücklisten für Baugruppen und Maschinen unter Anwendung von SAP\n\n- Unterstützung bei der technischen Dokumentation sowie Abstimmung mit angrenzenden Fachabteilungen\n\nIhr Profil:\n- Abgeschlossene Ausbildung als Technischer Produktdesigner oder eine vergleichbare Qualifikation\n\n- Praktische Erfahrung im (Sonder-)Anlagenbau\n\n- Fundiertes Wissen in der Erstellung und Detaillierung komplexer technischer Zeichnungen und Baugruppen\n\n- Sicherer Umgang mit gängigen CAD-Systemen wie Solid Edge oder SolidWorks\n\n- Ausgeprägtes technisches Verständnis sowie die Fähigkeit, konstruktive Zusammenhänge schnell zu erfassen\n\n- Erfahrung im Umgang mit SAP, insbesondere im Bereich Stücklisten oder Konstruktionsdaten\n\nSkills: Anlagenbau, CAD, Detaillierung, Dokumentation, Maschinenbau, Optimierung, SAP, Solid Edge, SolidWorks\n\nAnsprechpartner:\nWladislaw Samakin\nProfessional Recruiting\nFERCHAU Contract GmbH, Niederlassung Frankfurt CONTRACT\nHerriotstraße 1\n60528 Frankfurt\n+49 69 2992074-34\neic-contract@ferchau.com","Wir suchen einen erfahrenen Technischen Produktdesigner für den Bereich Maschinenbau am Standort München. In dieser Position übernehmen Sie die verantwortungsvolle Aufgabe der Erstellung und Ausarbeitung normkonformer technischer Zeichnungen für komplexe Baugruppen und Anlagenkomponenten.\n\nZu Ihren Hauptaufgaben gehört die Durchführung von Detailkonstruktionen sowie die kontinuierliche Optimierung und Anpassung bestehender Baugruppen und Einzelteile. Sie pflegen und entwickeln Konstruktionsunterlagen im Rahmen von Änderungsprozessen weiter und fertigen Stücklisten für Baugruppen und Maschinen unter Anwendung von SAP an. Darüber hinaus unterstützen Sie bei der technischen Dokumentation und stimmen sich mit angrenzenden Fachabteilungen ab.\n\nWir erwarten eine abgeschlossene Ausbildung als Technischer Produktdesigner oder eine vergleichbare Qualifikation. Praktische Erfahrung im Sonder-Anlagenbau sowie fundiertes Wissen in der Erstellung und Detaillierung komplexer technischer Zeichnungen und Baugruppen sind erforderlich. Sie sollten sicher im Umgang mit gängigen CAD-Systemen wie Solid Edge oder SolidWorks sein und über ein ausgeprägtes technisches Verständnis verfügen, um konstruktive Zusammenhänge schnell zu erfassen. Erfahrung im Umgang mit SAP, insbesondere im Bereich Stücklisten oder Konstruktionsdaten, rundet Ihr Profil ab.\n\nFreuen Sie sich auf eine abwechslungsreiche Tätigkeit in einem technisch anspruchsvollen Umfeld mit interessanten Entwicklungsmöglichkeiten im Maschinenbau.","de","FE74-72086-F-CO","https:\u002F\u002Ftouch.ferchau.com\u002Fde\u002Fde\u002Fprojekt\u002F506293",{"items":33},[34,52,64,82,97,112,127,144,165,177,195,208,226,243,258],{"id":35,"slug":36,"title":37,"skills":38,"budget":17,"duration":47,"location":48,"onsitePercent":49,"contractType":20,"foundAt":50,"category":51},5628,"konzepterstellung-paletttierung","Konzepterstellung Paletttierung",[39,40,41,42,43,44,45,46],"Palettierung","Robotik","Cobot-Roboter","Konzepterstellung","Lastenheft","Analyse","Entwicklung","Mobilität","4 Monate","Aachen",50,"2026-05-22T15:26:19+00:00",{"id":23,"slug":24,"label":25},{"id":53,"slug":54,"title":55,"skills":56,"budget":17,"duration":17,"location":61,"onsitePercent":19,"contractType":20,"foundAt":62,"category":63},5513,"fertigungsplaner-mwd-3","Fertigungsplaner (m\u002Fw\u002Fd)",[57,14,58,59,11,60,13,44],"Produktionsplanung","Fertigungsprozesse","Musterfertigung","Koordination","Erlangen","2026-05-22T14:26:19+00:00",{"id":23,"slug":24,"label":25},{"id":65,"slug":66,"title":67,"skills":68,"budget":17,"duration":17,"location":79,"onsitePercent":19,"contractType":20,"foundAt":80,"category":81},5512,"instandhalter-mechanik-mwd","Instandhalter - Mechanik (m\u002Fw\u002Fd)",[69,70,71,72,73,74,75,76,77,78,60,11],"Industriemechaniker","Mechanik","Pneumatik","Hydraulik","Elektrik","Elektrotechnik","Instandhaltung","Anlagen","Arbeitssicherheit","MS-Office","Oststeinbek","2026-05-22T14:26:04+00:00",{"id":23,"slug":24,"label":25},{"id":83,"slug":84,"title":85,"skills":86,"budget":17,"duration":92,"location":93,"onsitePercent":94,"contractType":20,"foundAt":95,"category":96},5493,"engineering-base-consultant-mwd","Engineering Base Consultant (m\u002Fw\u002Fd)",[87,88,89,90,91],"Engineering Base","Technische Dokumentation","Engineering-Prozesse","Planungsprozesse","Dokumentationsqualität","3-4 Monate (01.08.2026 - 31.12.2026)","Frankfurt am Main",80,"2026-05-22T13:50:30+00:00",{"id":23,"slug":24,"label":25},{"id":98,"slug":99,"title":100,"skills":101,"budget":17,"duration":17,"location":109,"onsitePercent":19,"contractType":20,"foundAt":110,"category":111},5472,"mechatroniker-mwd-kaeltetechnik","Mechatroniker (m\u002Fw\u002Fd) Kältetechnik",[76,11,102,103,104,105,13,106,107,108],"Inbetriebnahme","Klimatechnik","Kältetechnik","MSR","Regelungstechnik","Reparatur","Wartung","Mannheim","2026-05-22T13:27:44+00:00",{"id":23,"slug":24,"label":25},{"id":113,"slug":114,"title":115,"skills":116,"budget":17,"duration":17,"location":124,"onsitePercent":49,"contractType":20,"foundAt":125,"category":126},5469,"ce-dokumentation-druckgeraeterichtlinie-201468eu","CE-Dokumentation & Druckgeräterichtlinie (2014\u002F68\u002FEU)",[117,118,119,120,121,122,8,12,123,88],"CE-Dokumentation","Druckgeräterichtlinie","PED 2014\u002F68\u002FEU","Konformitätsbewertung","Risikoanalysen","Verfahrenstechnik","Qualitätssicherung","Münster","2026-05-22T13:27:02+00:00",{"id":23,"slug":24,"label":25},{"id":128,"slug":129,"title":130,"skills":131,"budget":17,"duration":17,"location":141,"onsitePercent":19,"contractType":20,"foundAt":142,"category":143},5467,"messtechniker-qualitaetssicherung-mwd","Messtechniker Qualitätssicherung (m\u002Fw\u002Fd)",[132,133,134,123,135,136,137,138,139,140],"Messtechnik","3D-Koordinatenmessmaschinen","PC-DMIS CAD++","EN 9102","ISO 9001","MS Excel","Technische Zeichnungen","Werkzeugmechaniker","Zerspanungsmechaniker","Pinneberg","2026-05-22T13:26:33+00:00",{"id":23,"slug":24,"label":25},{"id":145,"slug":146,"title":147,"skills":148,"budget":17,"duration":17,"location":162,"onsitePercent":19,"contractType":20,"foundAt":163,"category":164},5466,"projektleiter-verfahrenstechnik-mwd","Projektleiter Verfahrenstechnik (m\u002Fw\u002Fd)",[122,149,150,151,152,153,60,154,155,156,157,158,159,160,161],"Projektleitung","MS Project","Beschaffung","ChemCAD","Führung","Montageüberwachung","PRINCE2","Planung","Qualität","Risikomanagement","Simulationssoftware","Spezifikation","Umwelttechnik","Burgkirchen an der Alz","2026-05-22T13:26:18+00:00",{"id":23,"slug":24,"label":25},{"id":166,"slug":167,"title":168,"skills":169,"budget":17,"duration":17,"location":162,"onsitePercent":19,"contractType":20,"foundAt":175,"category":176},5465,"projektingenieur-verfahrenstechnik-mwd","Projektingenieur Verfahrenstechnik (m\u002Fw\u002Fd)",[122,8,152,170,171,172,150,173,160,174,102],"Aspen Plus","Bilanzierung","Druckverlustberechnung","Projektmanagement","Auslegung","2026-05-22T13:26:03+00:00",{"id":23,"slug":24,"label":25},{"id":178,"slug":179,"title":180,"skills":181,"budget":17,"duration":191,"location":192,"onsitePercent":19,"contractType":20,"foundAt":193,"category":194},5446,"fertigungsplaner-in-montage-mwd","Fertigungsplaner\u002F-in Montage (m\u002Fw\u002Fd)",[182,183,184,185,186,187,188,189,190],"Ingenieurstudium Mechanik\u002FProduktion","Fertigungs- und Montageplanung","Projekterfahrung","Wertstrom- und Linienplanung","BPS","MTM-Zeitwirtschaft","SAP CAPP","Deutsch","Englisch","10-12 months","Plochingen","2026-05-22T12:28:25+00:00",{"id":23,"slug":24,"label":25},{"id":196,"slug":197,"title":198,"skills":199,"budget":17,"duration":17,"location":205,"onsitePercent":19,"contractType":20,"foundAt":206,"category":207},5442,"industriemechaniker-sondermaschinenbau-mwd","Industriemechaniker Sondermaschinenbau (m\u002Fw\u002Fd)",[69,200,201,12,76,102,202,14,203,123,204,11],"Sondermaschinenbau","Montage","Schweißen","ERP","MS Office","Salzgitter","2026-05-22T12:26:40+00:00",{"id":23,"slug":24,"label":25},{"id":209,"slug":210,"title":211,"skills":212,"budget":17,"duration":223,"location":18,"onsitePercent":19,"contractType":20,"foundAt":224,"category":225},5441,"stress-dynamics-engineer-mfd-muenchen-on-site","Stress & Dynamics Engineer (m\u002Ff\u002Fd) - München on site",[9,213,214,215,216,217,218,219,220,221,222],"Documentation","Dynamics","Simulation","Simulink","Test","Test planning","Matlab","FEA simulation","Solidworks Simulation","Simcenter","3-5 Monate","2026-05-22T12:26:24+00:00",{"id":23,"slug":24,"label":25},{"id":227,"slug":228,"title":229,"skills":230,"budget":239,"duration":240,"location":17,"onsitePercent":17,"contractType":20,"foundAt":241,"category":242},5415,"layouter-im-intralogistik-bereich","Layouter im Intralogistik-Bereich",[231,232,233,234,235,236,237,238],"INVENTOR","Factory Design Utilities","Autodesk Vault","CATIA","Intralogistik","3D Layouts","Fördertechnik","Regalbediengeräte","auf Anfrage","6 Monate ++","2026-05-22T10:31:07+00:00",{"id":23,"slug":24,"label":25},{"id":244,"slug":245,"title":246,"skills":247,"budget":17,"duration":17,"location":255,"onsitePercent":19,"contractType":20,"foundAt":256,"category":257},5406,"technischer-sachbearbeiter-mwd-2","Technischer Sachbearbeiter (m\u002Fw\u002Fd)",[12,248,249,14,250,251,252,253,88,254],"Rohrleitungsbau","AutoCAD","Teamcenter PLM","DIN 2303","Antriebe","Armaturen","Verifikationsmanagement","Kiel","2026-05-22T10:28:27+00:00",{"id":23,"slug":24,"label":25},{"id":259,"slug":260,"title":261,"skills":262,"budget":17,"duration":223,"location":18,"onsitePercent":19,"contractType":20,"foundAt":273,"category":274},5400,"mechanical-designer-packaging-human-factors-mfd-muenchen-on-site","Mechanical Designer - Packaging & Human Factors (m\u002Ff\u002Fd) - München on site",[9,263,264,265,266,267,268,269,270,271,272],"DMU","Design","Electronics","Mechanical","NX","Siemens NX","Solidworks","Human Factors","Ergonomics","Ruggedization","2026-05-22T10:26:59+00:00",{"id":23,"slug":24,"label":25}]