[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"project-technical-administrative-coordinator-60-remote-brussels-19-months-asap":3,"similar-technical-administrative-coordinator-60-remote-brussels-19-months-asap":30},{"id":4,"slug":5,"title":6,"skills":7,"budget":15,"duration":16,"location":17,"onsitePercent":18,"contractType":19,"foundAt":20,"category":21,"description":25,"rawText":26,"language":27,"projectId":28,"sourceUrl":29},4445,"technical-administrative-coordinator-60-remote-brussels-19-months-asap","Technical Administrative Coordinator (60% Remote, Brussels, 19 months, ASAP)",[8,9,10,11,12,13,14],"AutoCAD","MS Office","ProjectWise","Vault","Electrical drafting","Data management systems","Technical drawings",null,"19 Monate","Brüssel",40,"contracting","2026-05-19T11:54:56+00:00",{"id":22,"slug":23,"label":24},13,"energy","Energie & Umwelt","Technical Administrative Coordinator position in the energy sector for administrative and technical management of projects. Responsibilities include management of principle drawings, creation of drawing numbers in Vault, and coordination with partners. Experience with AutoCAD and data management systems required.","FEL260521P2A1: Technical Administrative Coordinator (60% Remote, Brussels, 19 months, ASAP)\n\njoyIT Recruiting GmbHAnsprechpartner: joyIT Recruiting GmbH\nBrüssel, Belgien\n60% RemoteFreiberuflichab sofortDauer 19 Monate100% Auslastung\n\n- Projekt drucken\n- Projekt melden\nProjekt teilen\n\nTeilen Sie das Projekt per E-Mail\n\nProjekt melden\n\nNachdem Sie das Projekt gemeldet haben, erhalten Sie eine Bestätigung per E-Mail. Wir prüfen Ihre Angaben und ergreifen bei Bedarf die erforderlichen Maßnahmen.\n\nEnergiewirtschaftCADAutoCADAdmin-ToolsDesign ManagementProjectwiseVaultAs-built ZeichnungenTechnische ZeichnungenAutodesk AutocadTechnische Zeichnungen Lesen\nBeschreibung\n\nWe support our client within the framework of a Technical Administrative Coordinator in the energy sector, contributing to the administrative and technical management and follow-up of projects.\nResponsibilities\n- Management of principle drawings at the beginning, during, and at the end of projects\n- Creation and management of drawing numbers and directory structures in Vault\n- Provision and verification of drawings (PDF\u002FDWF) and control of CFC status\n- Printing, distribution, and communication related to drawings\n- Preparation of single-line diagrams and processing of redlining\n- Management of the RTU\u002FDCS mailbox and coordination with partners\n- Management of manufacturer drawings and related documentation folders\nQualifications\n- Experience with AutoCAD\n- Experience with MS Office tools\n- Experience in electrical drafting (an advantage)\n- Experience with data management systems (ProjectWise\u002FVault)\n- Ideally bilingual French\u002FDutch or basic knowledge of the other language\nAdditional Information\n- Location: Brussels\n- Onsite presence: 2 days per week\n- Training will be provided for the different tools (AutoCAD, Vault, ProjectWise, connector)\nPlease activate the option ‘send mail along’ when submitting your application.\nAfter submitting your application, you will automatically receive an application link for the next steps in the process.\nPlease apply only if you are technically suitable for the position and your rate expectations match the project.\nThe further application process for projects is handled via our website www.joyit.de.\nWe look forward to receiving your application.\nYour team at joyIT.\nBewerben","en","FEL260521P2A1","https:\u002F\u002Fwww.freelancermap.de\u002Fprojekt\u002Ffel260521p2a1-technical-administrative-coordinator-60-prozent-remote-brussels-19-months-asap",{"items":31},[32,51,69,87,105],{"id":33,"slug":34,"title":35,"skills":36,"budget":15,"duration":15,"location":47,"onsitePercent":48,"contractType":19,"foundAt":49,"category":50},4915,"ot-administrator-systemfuehrung-netzbetrieb-mwd","OT-Administrator Systemführung & Netzbetrieb (m\u002Fw\u002Fd)",[37,38,39,40,41,42,43,44,45,46],"Administration","Automatisierung","SCADA","Big Data","OT-Systeme","Fernwirktechnik","Datenbanksysteme","IT-Systemlandschaften","Energienetze","Versorgungsnetze","Celle",50,"2026-05-20T18:25:37+00:00",{"id":22,"slug":23,"label":24},{"id":52,"slug":53,"title":54,"skills":55,"budget":15,"duration":64,"location":65,"onsitePercent":66,"contractType":19,"foundAt":67,"category":68},4888,"tga-ingenieur-mwd","TGA Ingenieur (m\u002Fw\u002Fd)",[56,57,58,59,8,60,61,62,63],"Versorgungstechnik","Energietechnik","Gebäudetechnik","HLK-Systeme","Revit","liNear","DIN","VDI","> 12 months","Brunswick",100,"2026-05-20T15:11:00+00:00",{"id":22,"slug":23,"label":24},{"id":70,"slug":71,"title":72,"skills":73,"budget":82,"duration":83,"location":84,"onsitePercent":66,"contractType":19,"foundAt":85,"category":86},4874,"bauleiter-nach-landesbauordnung-mwd","Bauleiter nach Landesbauordnung (m\u002Fw\u002Fd)",[74,75,76,77,78,79,80,81],"Bauleitung","Landesbauordnung","Kraftwerksbau","Energieerzeugung","Bauordnungsrecht","Genehmigungsprozesse","Projektkoordination","Arbeitssicherheit","auf Anfrage","> 12 Monate","Berlin","2026-05-20T14:26:38+00:00",{"id":22,"slug":23,"label":24},{"id":88,"slug":89,"title":90,"skills":91,"budget":15,"duration":15,"location":102,"onsitePercent":66,"contractType":19,"foundAt":103,"category":104},4869,"projektleiter-energieinfrastruktur-freileitungsbau-mwd","Projektleiter Energieinfrastruktur \u002F Freileitungsbau (m\u002Fw\u002Fd)",[92,93,94,95,96,97,98,99,100,101],"Projektmanagement","Elektrotechnik","Bauingenieurwesen","Energieinfrastruktur","Freileitungsbau","Koordination","Planung","Analyse","Optimierung","Steuerung","Braunschweig","2026-05-20T14:25:29+00:00",{"id":22,"slug":23,"label":24},{"id":106,"slug":107,"title":108,"skills":109,"budget":15,"duration":116,"location":117,"onsitePercent":66,"contractType":19,"foundAt":118,"category":119},4813,"projektleiter-freileitungsbau","Projektleiter Freileitungsbau",[110,96,111,112,113,114,115],"Projektleitung","Hochspannungstechnik","Kosten- und Terminmanagement","VOB\u002FBGB-Vertragsrecht","Baustellenkoordination","Nachunternehmersteuerung","4 Monate +","Deutschland","2026-05-20T12:30:26+00:00",{"id":22,"slug":23,"label":24}]