[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"project-servicetechniker-maschinenbau-mwd":3,"similar-servicetechniker-maschinenbau-mwd":37},{"id":4,"slug":5,"title":6,"skills":7,"budget":22,"duration":22,"location":23,"onsitePercent":24,"contractType":25,"foundAt":26,"category":27,"description":31,"rawText":32,"webTitle":6,"webText":33,"language":34,"projectId":35,"sourceUrl":36},10819,"servicetechniker-maschinenbau-mwd","Servicetechniker Maschinenbau (m\u002Fw\u002Fd)",[8,9,10,11,12,13,14,15,16,17,18,19,20,21],"Mechatronik","Industriemechanik","Hydraulik","Pneumatik","SPS-Steuerungen","Siemens S7","Beckhoff TwinCAT","Siemens TIA Portal","EPLAN","SAP","Fehleranalyse","Technische Zeichnungen","MS Office","Deutsch B2",null,"Horst, Schleswig-Holstein",100,"contracting","2026-06-03T12:25:51+00:00",{"id":28,"slug":29,"label":30},9,"mechanical","Maschinenbau & Konstruktion","Durchführung von Wartungs- und Reparaturarbeiten an Maschinen und Anlagen beim Kunden vor Ort. Inbetriebnahme, Diagnose technischer Störungen mittels Siemens TIA Portal oder EPLAN sowie Schulung von Bedienern. Dokumentation aller Serviceeinsätze im ERP-System.","Servicetechniker Maschinenbau (m\u002Fw\u002Fd)\nProjektnummer: FE22-25843-EH\nStandort: Horst, Schleswig-Holstein\nArbeitsweise: Vor Ort\nLaufzeit: Keine Angabe\nStartdatum: Keine Angabe\n\nDeine Aufgaben:\n- Durchführung von Wartungs- und Reparaturarbeiten\n\n- Inbetriebnahme und Test neuer Anlagen beim Kunden vor Ort\n\n- Analyse technischer Störungen mittels Diagnosetools wie Siemens TIA Portal oder EPLAN\n\n- Austausch defekter Baugruppen und Komponenten\n\n- Dokumentation aller Serviceeinsätze im ERP-System (z. B. SAP oder Infor)\n\n- Unterstützung bei der Optimierung bestehender Produktionsprozesse\n\n- Schulung von Bediener:innen in Handhabung, Sicherheit und Wartung der Anlagen\n\n- Zusammenarbeit mit Kolleg:innen aus Elektro- und Steuerungstechnik\n\nDein Profil:\n- Abgeschlossene Ausbildung als Mechatroniker:in, Industriemechaniker:in oder vergleichbare Qualifikation\n\n- Kenntnisse in Hydraulik, Pneumatik und SPS-Steuerungen (z. B. Siemens S7, Beckhoff TwinCAT)\n\n- Erfahrung im Umgang mit technischen Zeichnungen und Schaltplänen\n\n- Reisebereitschaft für Außendiensteinsätze beim Kunden\n\n- Erfahrung im Maschinenbau oder in der Verpackungsindustrie von Vorteil\n\n- Anwendung gängiger Diagnosetools zur Fehleranalyse\n\n- Sicherer Umgang mit MS Office und ERP-Systemen (z. B. SAP)\n\n- Deutschkenntnisse mind. B2, Englischkenntnisse von Vorteil\n\nSkills: Analyse, Anlagen, Dokumentation, EPLAN, ERP, Fehleranalyse, Hydraulik, Inbetriebnahme, Industriemechaniker, MS, Maschinenbau, Optimierung, Pneumatik, SAP, SPS, SPS-Steuerungen, Sicherheit, Steuerungstechnik, Test, Wartung\n\nAnsprechpartner:\nTill Dallmann\nPersonalreferent\nFERCHAU GmbH, Niederlassung Elmshorn\nRamskamp 69\n25337 Elmshorn\n+49 4121 49164-19\ntill.dallmann@ferchau.com","Wir suchen einen erfahrenen Servicetechniker im Bereich Maschinenbau für unseren Standort in Schleswig-Holstein. In dieser Vor-Ort-Position führen Sie Wartungs- und Reparaturarbeiten an industriellen Anlagen durch und sind Ansprechpartner für unsere Kunden bei technischen Herausforderungen.\n\nIhre Aufgaben umfassen die Inbetriebnahme und das Testen neuer Anlagen beim Kunden, die Analyse technischer Störungen mittels moderner Diagnosetools sowie den Austausch defekter Komponenten. Sie dokumentieren alle Serviceeinsätze systematisch und unterstützen bei der Optimierung bestehender Produktionsprozesse. Darüber hinaus schulen Sie Bediener in der korrekten Handhabung, Sicherheit und Wartung der Maschinen und arbeiten eng mit Kolleg:innen aus den Bereichen Elektro- und Steuerungstechnik zusammen.\n\nFür diese Position bringen Sie eine abgeschlossene Ausbildung als Mechatroniker:in oder Industriemechaniker:in mit. Fundierte Kenntnisse in Hydraulik, Pneumatik und SPS-Steuerungen (z. B. Siemens S7) sind erforderlich. Sie sind sicher im Umgang mit technischen Zeichnungen, Schaltplänen und gängigen Diagnosetools. Praktische Erfahrung im Maschinenbau oder in der Verpackungsindustrie ist von Vorteil.\n\nSelbstverständlich beherrschen Sie MS Office und ERP-Systeme und verfügen über Deutschkenntnisse auf B2-Niveau. Englischkenntnisse sind wünschenswert. Ihre Reisebereitschaft für Außendiensteinsätze beim Kunden ist Voraussetzung für diese Rolle.\n\nWir bieten eine verantwortungsvolle Tätigkeit in einem dynamischen Umfeld mit vielfältigen technischen Herausforderungen und guten Entwicklungsperspektiven.","de","FE22-25843-EH","https:\u002F\u002Ftouch.ferchau.com\u002Fde\u002Fde\u002Fprojekt\u002F507406",{"items":38},[39,53,71,88,106,124,138,151,164,179,194,210,222,242,258],{"id":40,"slug":41,"title":42,"skills":43,"budget":22,"duration":50,"location":22,"onsitePercent":24,"contractType":25,"foundAt":51,"category":52},10862,"layoutplaner-fuer-halbleiterindustrie","Layoutplaner für Halbleiterindustrie",[44,45,46,47,48,49],"Layoutplanung Halbleiterindustrie","CAD","Auto Sketch 9","Microsoft Office","Deutsch","Englisch","12 Monate, Start 01.07.2026","2026-06-03T13:30:36+00:00",{"id":28,"slug":29,"label":30},{"id":54,"slug":55,"title":56,"skills":57,"budget":22,"duration":22,"location":67,"onsitePercent":24,"contractType":68,"foundAt":69,"category":70},10851,"berufseinsteiger-automatisierungstechnik-pharma-mwd","Berufseinsteiger Automatisierungstechnik Pharma (m\u002Fw\u002Fd)",[58,59,8,60,61,62,63,64,65,66],"Automatisierungstechnik","Elektrotechnik","Elektronik","Troubleshooting","Monitoring","Analyse","Dokumentation","Teamfähigkeit","Kommunikation","Kufstein, Tirol","permanent","2026-06-03T13:26:28+00:00",{"id":28,"slug":29,"label":30},{"id":72,"slug":73,"title":74,"skills":75,"budget":22,"duration":84,"location":85,"onsitePercent":24,"contractType":25,"foundAt":86,"category":87},10844,"sps-programmierung-und-visualisierung-mit-tia-portal","SPS-Programmierung und Visualisierung mit TIA-Portal",[76,77,78,79,80,58,81,82,83],"TIA-Portal","WinCC Unified","SPS-Programmierung","Siemens S7-1500","Siemens S7-1200","Fördertechnik","Wägetechnik","Gravimetrie","4 Monate, Start 08.06.2026","Lengerich, Nordrhein-Westfalen","2026-06-03T13:25:34+00:00",{"id":28,"slug":29,"label":30},{"id":89,"slug":90,"title":91,"skills":92,"budget":22,"duration":22,"location":102,"onsitePercent":103,"contractType":68,"foundAt":104,"category":105},10843,"projektkoordinator-anlagenbau-mwd","Projektkoordinator Anlagenbau (m\u002Fw\u002Fd)",[93,94,95,96,64,97,98,99,100,101],"Projektmanagement","Anlagenbau","Koordination","Kalkulation","Planung","Steuerung","Sondermaschinenbau","Qualitätsmanagement","Lösungsorientiertes Denken","Innsbruck",50,"2026-06-03T13:25:27+00:00",{"id":28,"slug":29,"label":30},{"id":107,"slug":108,"title":109,"skills":110,"budget":22,"duration":22,"location":23,"onsitePercent":24,"contractType":25,"foundAt":122,"category":123},10823,"konstrukteur-inventor-mwd","Konstrukteur Inventor (m\u002Fw\u002Fd)",[111,112,45,113,8,114,115,116,17,117,118,119,120,121],"Autodesk Inventor","AutoCAD Mechanical","Maschinenbau","Technische Dokumentation","PLM-Systeme","Siemens Teamcenter","SolidWorks PDM","Fertigungsverfahren","Zerspanung","Schweißen","Blechbearbeitung","2026-06-03T12:26:25+00:00",{"id":28,"slug":29,"label":30},{"id":125,"slug":126,"title":127,"skills":128,"budget":22,"duration":22,"location":135,"onsitePercent":24,"contractType":68,"foundAt":136,"category":137},10822,"technischer-sachbearbeiter-mwd-3","Technischer Sachbearbeiter (m\u002Fw\u002Fd)",[129,130,20,131,132,133,134],"Industriemechaniker","Mechatroniker","ERP-Systeme","Auftragsbearbeitung","Qualitätskontrolle","Kundenkommunikation","Gersthofen, Bayern","2026-06-03T12:26:15+00:00",{"id":28,"slug":29,"label":30},{"id":139,"slug":140,"title":141,"skills":142,"budget":22,"duration":22,"location":148,"onsitePercent":103,"contractType":25,"foundAt":149,"category":150},10818,"material-supplier-quality-engineer-mwd","Material- & Supplier Quality Engineer (m\u002Fw\u002Fd)",[143,113,144,145,146,147,63,97,95,20,48,49],"Materialwissenschaften","Materialprüfung","Lieferantenmanagement","Lieferantenaudits","Qualifizierung","Weiz, Steiermark","2026-06-03T12:25:43+00:00",{"id":28,"slug":29,"label":30},{"id":152,"slug":153,"title":154,"skills":155,"budget":22,"duration":160,"location":161,"onsitePercent":24,"contractType":25,"foundAt":162,"category":163},10807,"konstruktion-im-stahl-und-containersonderbau","Konstruktion im Stahl- und Containersonderbau",[156,157,17,158,159,20,114],"Creo 11.0","Windchill","Stahlbaukonstruktion","Containersonderbau","3 Monate, Start: 08.06.2026","Mühlau, Sachsen","2026-06-03T11:26:47+00:00",{"id":28,"slug":29,"label":30},{"id":165,"slug":166,"title":167,"skills":168,"budget":22,"duration":22,"location":176,"onsitePercent":24,"contractType":68,"foundAt":177,"category":178},10806,"konstrukteur-mwd-2","Konstrukteur (m\u002Fw\u002Fd)",[45,111,169,19,170,171,172,173,174,175],"3D-Konstruktion","FEM-Berechnungen","Maschinenbaunormen","MS-Office","Dokumentenmanagement","Schraubenverbindungen","Metallbau","Bremen","2026-06-03T11:26:39+00:00",{"id":28,"slug":29,"label":30},{"id":180,"slug":181,"title":182,"skills":183,"budget":22,"duration":190,"location":191,"onsitePercent":103,"contractType":25,"foundAt":192,"category":193},10805,"integration-von-baugruppen-in-eplan-preplanning-nach-iec-81346","Integration von Baugruppen in EPLAN Preplanning nach IEC 81346",[184,185,45,186,187,64,188,189],"EPLAN Preplanning","P&ID-Erstellung","Betriebsmittelkennzeichnung","IEC 81346","Migration","Modellierung","7 Monate, Start 22.06.2026","Marburg, Hessen","2026-06-03T11:26:32+00:00",{"id":28,"slug":29,"label":30},{"id":195,"slug":196,"title":197,"skills":198,"budget":22,"duration":206,"location":207,"onsitePercent":103,"contractType":25,"foundAt":208,"category":209},10803,"durchfuehrung-von-refa-zeitstudien-im-stahlbau","Durchführung von REFA-Zeitstudien im Stahlbau",[199,200,201,202,203,17,204,205],"REFA-Methoden","Zeitstudien","Stahlbaukomponenten","Fertigungsanalyse","Prozessoptimierung","Montage","Qualitätsprüfung","14 Monate","Stadtlohn, Nordrhein-Westfalen","2026-06-03T11:26:18+00:00",{"id":28,"slug":29,"label":30},{"id":211,"slug":212,"title":213,"skills":214,"budget":22,"duration":22,"location":219,"onsitePercent":24,"contractType":25,"foundAt":220,"category":221},10781,"arbeitsvorbereiter-schiffbau-mwd","Arbeitsvorbereiter Schiffbau (m\u002Fw\u002Fd)",[215,216,19,17,131,20,217,218,95,113],"Arbeitsvorbereitung","Schiffbau","Excel","Kapazitätsplanung","Hamburg","2026-06-03T10:25:58+00:00",{"id":28,"slug":29,"label":30},{"id":223,"slug":224,"title":225,"skills":226,"budget":22,"duration":238,"location":239,"onsitePercent":24,"contractType":25,"foundAt":240,"category":241},10771,"inbetriebnehmer-mwd-automatisierung-beckhoff-twincat","Inbetriebnehmer (m\u002Fw\u002Fd) Automatisierung Beckhoff Twincat",[227,228,229,230,231,232,233,234,235,236,237],"Beckhoff TwinCAT 3","Stäubli Robotik","Antriebstechnik","Motorinbetriebnahme","Maschinensicherheit","TwinSAFE","Fehlersuche","Inbetriebnahme automatisierter Anlagen","IEC 61131-3","EtherCAT","Profinet","6 Monate","Heidelberg, Ulm","2026-06-03T09:45:29+00:00",{"id":28,"slug":29,"label":30},{"id":243,"slug":244,"title":245,"skills":246,"budget":22,"duration":254,"location":22,"onsitePercent":255,"contractType":25,"foundAt":256,"category":257},10767,"3d-zeichnungsableitung-mit-nx-und-siemens-teamcenter","3D-Zeichnungsableitung mit NX und Siemens Teamcenter",[247,116,248,113,249,250,251,252,253],"NX","3D-Zeichnungserstellung","Form- und Lagetoleranzen","DIN ISO 2768","ISO GPS","Schweißteile","Brennteile","12 Monate +",10,"2026-06-03T09:30:39+00:00",{"id":28,"slug":29,"label":30},{"id":259,"slug":260,"title":261,"skills":262,"budget":22,"duration":268,"location":269,"onsitePercent":270,"contractType":25,"foundAt":271,"category":272},10750,"konstrukteur-mwd-spritzguss","Konstrukteur (m\u002Fw\u002Fd) Spritzguss",[263,264,265,113,266,267,19],"Konstruktion Kunststoffbauteile","Spritzguss","CAD CatiaV5","Kunststofftechnik","Moldflow-Analysen","3 Monate","Ludwigsburg",80,"2026-06-03T08:40:28+00:00",{"id":28,"slug":29,"label":30}]