[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"project-projektingenieur-versorgungstechnik-mwd":3,"similar-projektingenieur-versorgungstechnik-mwd":31},{"id":4,"slug":5,"title":6,"skills":7,"budget":16,"duration":16,"location":17,"onsitePercent":18,"contractType":19,"foundAt":20,"category":21,"description":25,"rawText":26,"webTitle":6,"webText":27,"language":28,"projectId":29,"sourceUrl":30},12049,"projektingenieur-versorgungstechnik-mwd","Projektingenieur Versorgungstechnik (m\u002Fw\u002Fd)",[8,9,10,11,12,13,14,15],"Versorgungstechnik","Gebäudetechnik","Planung","Revit","Qualitätssicherung","Reporting","SHK","Trimble Nova",null,"Münster",100,"contracting","2026-06-10T10:25:47+00:00",{"id":22,"slug":23,"label":24},12,"construction","Bauwesen & Architektur","Planung und Betreuung von gebäudetechnischen Anlagen in den Bereichen Heizungs-, Lüftungs- und Sanitärtechnik. Projektkoordination mit Bauherren, Architekten und ausführenden Firmen sowie Termin- und Kostenüberwachung.","Projektingenieur Versorgungstechnik (m\u002Fw\u002Fd)\nProjektnummer: FE56-85778-BO\nStandort: Münster, Nordrhein-Westfalen\nArbeitsweise: Vor Ort\nLaufzeit: Keine Angabe\nStartdatum: Keine Angabe\n\nDiese Herausforderungen übernimmst du:\n- Planung von gebäudetechnischen Anlagen in den Bereichen Heizungs-, Lüftungs - und Sanitärtechnik\n\n- Aktive Projektbetreuung und -koordination mit Bauherren, Architekten und ausführenden Firmen\n\n- Auslegung von technischen Anlagen sowie die zeichnerische Umsetzung der Planungslösungen\n\n- Termin- und Kostenüberwachung samt Reporting an die Niederlassungsleitung sowie Qualitätssicherung in den Projekten\n\nUnsere Erwartungen an dich:\n- Abgeschlossenes Ingenieurstudium im Bereich Versorgungstechnik\u002FGebäudetechnik oder eine vergleichbare fachspezifische Weiterbildung zum\u002Fr Techniker:in im Bereich SHK mit Planungserfahrung\n\n- Idealerweise mehrjährige Berufserfahrung in einer vergleichbaren Position\n\n- Trimble Nova\u002FRevit Erfahrung wünschenswert\n\n- Zielorientiertes Handeln und analytisches Denken\n\n- Kenntnis der relevanten Normen und rechtlichen Parameter\n\n- Fähigkeit zur ganzheitlichen Betrachtungsweise\n\n- Note: Please be aware that German is the working language in our project and good German language skills (level B2+) are a prerequisite for the position\n\nSkills: Anlagen, Auslegung, Gebäudetechnik, Planung, Qualitätssicherung, Reporting, Revit, Umsetzung, Versorgungstechnik\n\nAnsprechpartner:\nAlexandra Kluth\nTalent Sourcer\nFERCHAU GmbH, Niederlassung Bochum\nSuttner-Nobel-Allee 3-5\n44803 Bochum\n+49 234 516996-0\nbochum@ferchau.com","Wir suchen einen erfahrenen Projektingenieur für Versorgungstechnik (m\u002Fw\u002Fd) an unserem Standort in Münster. In dieser Rolle verantworten Sie die Planung und Umsetzung von gebäudetechnischen Anlagen in den Bereichen Heizungs-, Lüftungs- und Sanitärtechnik.\n\nIhre Aufgaben umfassen die aktive Projektbetreuung und Koordination mit Bauherren, Architekten und ausführenden Firmen. Sie führen die technische Auslegung von Anlagen durch und setzen Planungslösungen zeichnerisch um. Darüber hinaus überwachen Sie Termine und Kosten, erstellen Reportings und sichern die Qualität in den Projekten.\n\nWir erwarten ein abgeschlossenes Ingenieurstudium im Bereich Versorgungstechnik oder Gebäudetechnik beziehungsweise eine vergleichbare fachspezifische Weiterbildung zum Techniker im SHK-Bereich mit Planungserfahrung. Idealerweise bringen Sie mehrjährige Berufserfahrung in einer ähnlichen Position mit. Erfahrung mit Trimble Nova oder Revit ist wünschenswert.\n\nZum Profil gehören zielorientiertes Handeln, analytisches Denken und eine ganzheitliche Betrachtungsweise. Kenntnisse der relevanten Normen und rechtlichen Parameter sind erforderlich. Gute Deutschkenntnisse auf Niveau B2+ sind Voraussetzung, da Deutsch die Arbeitssprache ist.\n\nDie Position ist vor Ort in Münster zu besetzen. Wir bieten die Möglichkeit, in einem dynamischen Team an anspruchsvollen Projekten mitzuwirken und Ihre Fachkompetenz einzubringen.","de","FE56-85778-BO","https:\u002F\u002Ftouch.ferchau.com\u002Fde\u002Fde\u002Fprojekt\u002F505876",{"items":32},[33,54,69,83,99,119,134,152,170,185,200,217,234,250,262],{"id":34,"slug":35,"title":36,"skills":37,"budget":16,"duration":16,"location":49,"onsitePercent":50,"contractType":51,"foundAt":52,"category":53},12814,"projektleiter-anlagenbau-umwelttechnikwasser-mwd-in-direktvermittlung","Projektleiter Anlagenbau Umwelttechnik\u002FWasser (m\u002Fw\u002Fd) in Direktvermittlung",[38,39,40,41,42,43,44,45,46,47,48],"Projektmanagement","Anlagenbau","Umwelttechnik","ERP-Systeme","SAP","AutoCAD","VOB","HOAI","Vertragsmanagement","Kostenkontrolle","MS Office","Dresden",50,"permanent","2026-06-15T08:26:01+00:00",{"id":22,"slug":23,"label":24},{"id":55,"slug":56,"title":57,"skills":58,"budget":16,"duration":65,"location":66,"onsitePercent":18,"contractType":19,"foundAt":67,"category":68},12766,"qaqc-manager","QA\u002FQC-Manager",[12,59,60,61,62,63,64],"Qualitätskontrolle","Rohbau","Fassadenbau","Bauwesen","Großprojekte","Deutsch (fließend)","18 months","Lübbenau","2026-06-13T02:06:24+00:00",{"id":22,"slug":23,"label":24},{"id":70,"slug":71,"title":72,"skills":73,"budget":16,"duration":80,"location":16,"onsitePercent":18,"contractType":19,"foundAt":81,"category":82},12746,"bauleiter-fuer-sonderbauwerke-microtunnel-hdd-bohrpressungen","Bauleiter für Sonderbauwerke – Microtunnel, HDD, Bohrpressungen",[74,75,76,77,59,78,79],"Bauleitung Tiefbau","Microtunnel","HDD","Bohrpressungen","Arbeitssicherheit","Deutsch","Feb 2027","2026-06-12T15:30:33+00:00",{"id":22,"slug":23,"label":24},{"id":84,"slug":85,"title":86,"skills":87,"budget":16,"duration":94,"location":95,"onsitePercent":96,"contractType":19,"foundAt":97,"category":98},12711,"freiberuflich-bauueberwachung-elektrotechnik-lp8-mwd-grossraum-berlin","Freiberuflich: Bauüberwachung Elektrotechnik LP8 (m\u002Fw\u002Fd), Großraum Berlin",[88,89,90,91,92,93],"Bauüberwachung","Elektrotechnik","Leistungsphase 8","Primär- und Sekundärtechnik","Projektkoordination","Dokumentation","Anfang August bis Februar 2028 (+ Option auf Verlängerung)","Berlin",75,"2026-06-12T14:01:41+00:00",{"id":22,"slug":23,"label":24},{"id":100,"slug":101,"title":102,"skills":103,"budget":16,"duration":116,"location":16,"onsitePercent":18,"contractType":19,"foundAt":117,"category":118},12697,"umweltfachliche-bauueberwachung-ubue","Umweltfachliche Bauüberwachung (UBÜ)",[104,105,106,107,108,109,110,111,112,113,114,115],"Umweltfachliche Bauüberwachung","Habitatstrukturanalyse","Artenschutzrecht (BNatSchG)","Brutvögel","Fledermäuse","Reptilien","Amphibien","Biotopschutz","Ökologische Baubegleitung","GIS","Digitale Felddokumentation","Risikoabschätzung","1 Jahr+, Start 01.08.2026","2026-06-12T13:30:44+00:00",{"id":22,"slug":23,"label":24},{"id":120,"slug":121,"title":122,"skills":123,"budget":16,"duration":130,"location":131,"onsitePercent":50,"contractType":19,"foundAt":132,"category":133},12695,"dokumentencontroller-50-100-energieprojekte","Dokumentencontroller (50-100%) - Energieprojekte",[124,125,126,79,127,128,12,129],"Dokumentencontrolling","Procore","thinkproject","Englisch","Versionskontrolle","Claim Tracker System","12 Monate+","Bielefeld","2026-06-12T13:30:28+00:00",{"id":22,"slug":23,"label":24},{"id":135,"slug":136,"title":137,"skills":138,"budget":16,"duration":148,"location":149,"onsitePercent":18,"contractType":19,"foundAt":150,"category":151},12691,"qualitaetssicherung-und-pruefplanung-im-hoch-und-fassadenbau","Qualitätssicherung und Prüfplanung im Hoch- und Fassadenbau",[12,139,140,141,61,142,143,144,145,146,147,127],"Qualitätsmanagement","Prüfplanung","Hochbau","Stahlkonstruktion","ISO 9001","DIN EN 1090","Schweißtechnik","Korrosionsschutz","Technische Dokumentation","10 Monate, Start 29.06.2026","Würzburg, Bayern","2026-06-12T13:26:07+00:00",{"id":22,"slug":23,"label":24},{"id":153,"slug":154,"title":155,"skills":156,"budget":16,"duration":16,"location":167,"onsitePercent":18,"contractType":51,"foundAt":168,"category":169},12686,"bauingenieur-industriebau-mwd","Bauingenieur Industriebau (m\u002Fw\u002Fd)",[157,158,159,43,11,160,161,162,163,164,92,165,166,79,127],"Bauingenieurwesen","Industriebau","Baustatik","Allplan","RSTAB","Dlubal","SOFiSTiK","SCIA Engineer","Stahlbau","Stahlbetonbau","Lingen, Niedersachsen","2026-06-12T13:25:26+00:00",{"id":22,"slug":23,"label":24},{"id":171,"slug":172,"title":173,"skills":174,"budget":16,"duration":16,"location":182,"onsitePercent":18,"contractType":51,"foundAt":183,"category":184},12672,"meistertechniker-gebaeudetechnik-mwd-in-direktvermittlung","Meister\u002FTechniker Gebäudetechnik (m\u002Fw\u002Fd) in Direktvermittlung",[9,175,176,48,177,178,179,180,78,181],"HKLS","Facility Management","CAFM-Software","Wartung und Instandhaltung","VDI-Richtlinien","DIN EN Standards","Koordination","Heilbronn","2026-06-12T12:26:52+00:00",{"id":22,"slug":23,"label":24},{"id":186,"slug":187,"title":188,"skills":189,"budget":16,"duration":16,"location":197,"onsitePercent":50,"contractType":51,"foundAt":198,"category":199},12670,"projektleiter-mwd-im-stahlbau","Projektleiter (m\u002Fw\u002Fd) im Stahlbau",[38,165,141,190,191,192,193,43,194,195,46,196],"Kalkulation","Angebotserstellung","MS Project","Primavera","Tekla Structures","VOB\u002FB","Verhandlungen","Aurich, Niedersachsen","2026-06-12T12:26:37+00:00",{"id":22,"slug":23,"label":24},{"id":201,"slug":202,"title":203,"skills":204,"budget":16,"duration":213,"location":214,"onsitePercent":18,"contractType":19,"foundAt":215,"category":216},12632,"bauleiter-bauueberwacher-glasfaserausbau-mwd","Bauleiter \u002F Bauüberwacher Glasfaserausbau (m\u002Fw\u002Fd)",[205,88,206,207,208,209,210,211,92,212],"Bauleitung","Tiefbau","Glasfaserausbau","FTTH","Oberflächenherstellung","Asphaltierung","Straßenwiederherstellung","Stakeholder-Management","18 Monate +","Darmstadt","2026-06-12T10:30:25+00:00",{"id":22,"slug":23,"label":24},{"id":218,"slug":219,"title":220,"skills":221,"budget":16,"duration":230,"location":231,"onsitePercent":50,"contractType":19,"foundAt":232,"category":233},12631,"landschaftsplaner-im-konstruktiven-ingenieurbau","Landschaftsplaner im konstruktiven Ingenieurbau",[222,223,224,225,226,227,228,229],"Landschaftsplanung","Brücken- oder Straßenbau","Landschaftspflegerische Ausführungsplanung","Naturschutzfachliche Kompensationsmaßnahmen","HOAI Leistungsphasen 1-3","VOB (Vergabe- und Vertragsordnung für Bauleistungen)","Naturschutz- und Umweltschutzrecht","BIM","24 Monate","Lüneburg \u002F Hamburg","2026-06-12T10:30:18+00:00",{"id":22,"slug":23,"label":24},{"id":235,"slug":236,"title":237,"skills":238,"budget":16,"duration":246,"location":247,"onsitePercent":50,"contractType":19,"foundAt":248,"category":249},12629,"3d-laserscanning-und-bim-modellierung","3D-Laserscanning und BIM-Modellierung",[239,240,241,242,243,12,244,245],"3D-Laserscanning","Punktwolkenverarbeitung","BIM-Modellierung","Autodesk Revit","CAD","Datentransfer","Kollisionsprüfungen","26 Monate, Start 01.01.2027","Bayreuth, Bayern","2026-06-12T10:26:05+00:00",{"id":22,"slug":23,"label":24},{"id":251,"slug":252,"title":253,"skills":254,"budget":16,"duration":16,"location":259,"onsitePercent":18,"contractType":51,"foundAt":260,"category":261},12627,"kaufmaennischer-sachbearbeiter-bauwesen-mwd","Kaufmännischer Sachbearbeiter Bauwesen (m\u002Fw\u002Fd)",[42,48,255,256,257,191,258,62,79,127],"Excel","Word","Rechnungsbearbeitung","Kaufmännische Sachbearbeitung","Wuppertal","2026-06-12T10:25:50+00:00",{"id":22,"slug":23,"label":24},{"id":263,"slug":264,"title":265,"skills":266,"budget":16,"duration":274,"location":16,"onsitePercent":18,"contractType":19,"foundAt":275,"category":276},12615,"bauueberwachung-netzausbauprojekt-bauingenieur-mwd","Bauüberwachung Netzausbauprojekt - Bauingenieur (m\u002Fw\u002Fd)",[88,206,267,268,195,269,270,271,272,273],"Spezialtiefbau","Leistungsphasen 8 und 9","VOB\u002FC","DIN-Normen","BGB","Vergaberecht","Deutsch fließend","2 Jahre +","2026-06-12T09:30:32+00:00",{"id":22,"slug":23,"label":24}]