[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"project-plm-integration-engineer-mfd-muenchen-on-site":3,"similar-plm-integration-engineer-mfd-muenchen-on-site":38},{"id":4,"slug":5,"title":6,"skills":7,"budget":21,"duration":22,"location":23,"onsitePercent":24,"contractType":25,"foundAt":26,"category":27,"description":31,"rawText":32,"webTitle":33,"webText":34,"language":35,"projectId":36,"sourceUrl":37},5395,"plm-integration-engineer-mfd-muenchen-on-site","PLM Integration Engineer (m\u002Ff\u002Fd) - München on site",[8,9,10,11,12,13,14,15,16,17,18,19,20],"PLM Administration","Tool Integration","Workflows & Lifecycles","CAD & ERP Interfaces","Data Migration","User Support & Training","System Architecture","Process Optimization","Siemens Teamcenter","Solidworks PDM","SAP","MCAD","ECAD",null,"3-5 Monate","München",100,"contracting","2026-05-22T10:25:36+00:00",{"id":28,"slug":29,"label":30},9,"mechanical","Maschinenbau & Konstruktion","PLM Integration Engineer für die Administration und Konfiguration von PLM-Umgebungen zur Unterstützung der Entwicklung komplexer Luftfahrt- und Verteidigungsdrohnensysteme. Verantwortlich für die Integration zwischen PLM-System und Engineering-Projekten sowie die Optimierung digitaler Workflows.","PLM Integration Engineer (m\u002Ff\u002Fd) - München on site\nProjektnummer: FE34-23597-AVMUC\nStandort: Munich, Bavaria\nArbeitsweise: On-Site\nLaufzeit: 3 Months\nStartdatum: 01.06.2026\n\nPLM Integration Engineer (m\u002Ff\u002Fd) - München on site:\nLocation: München on site\n\nNo remote!\n\nstart: asap (for about 3-5 months)\n\nAccountabilities\n\n- Administer, configure, and maintain the company's PLM environment to support the development of complex aviation and defense drone systems\n\n- Act as the primary interface between the PLM system and active engineering projects, ensuring seamless tool integration and tailoring workflows to project-specific needs\n\n- Develop, deploy, and continuously optimize digital workflows within the PLM (e.g., release processes, ECR\u002FECO, document approvals)\n\n- Manage and maintain critical data interfaces between PLM, CAD tools (MCAD\u002FECAD), and downstream ERP or manufacturing systems\n\n- Provide hands-on troubleshooting, day-to-day user support, and tailored PLM training sessions for cross-functional engineering teams\n\n- Create and maintain comprehensive documentation regarding PLM system architecture, configurations, integration strategies, and user guidelines\n\n- Support data migration activities and plan software upgrades while ensuring zero disruption to ongoing engineering projects\n\n- Report on PLM integration status, system health, and future tool roadmap strategies to upper management\n\nExperience & Skills\n\n- 5+ years of professional working experience in PLM administration, architecture, or tool integration, preferably within the aerospace or defense industry\n\n- Expert, hands-on knowledge of configuring and managing major PLM\u002FPDM systems (preferred Siemens Teamcenter or Solidworks PDM)\n\n- Strong track record of integrating PLM with 3D\u002F2D CAD tools and enterprise ERP platforms (e.g., SAP)\n\n- Deep understanding of hardware engineering processes, engineering BOM (EBOM) management, and digital product lifecycles\n\n- Ideally, experience with system customization, scripting, or data mapping to support automated tool interfaces\n\n- Excellent written and verbal communication skills (English), with the ability to translate project requirements into PLM technical solutions\n\n- Keen fast track developments and realizations\n\n- Fun working in a highly flexible environment\n\nPLM Administration \u002F\u002F Tool Integration \u002F\u002F Workflows & Lifecycles \u002F\u002F CAD & ERP Interfaces \u002F\u002F Data Migration \u002F\u002F User Support & Training \u002F\u002F System Architecture \u002F\u002F Process Optimization:\nKeywords \n\nPLM Administration \u002F\u002F Tool Integration \u002F\u002F Workflows & Lifecycles \u002F\u002F CAD & ERP Interfaces \u002F\u002F Data Migration \u002F\u002F User Support & Training \u002F\u002F System Architecture \u002F\u002F Process Optimization\n\nSkills: Administration, Architecture, CAD, Data Migration, ERP, Integration, Migration, Optimization, PDM, PLM, SAP, Training\n\nAnsprechpartner:\nAntje Paul\nVertriebsassistentin\nFERCHAU GmbH, München Aerospace & Defence Branch\nParkring 2\n85748 Garching b. München\n+49 89 546799-0\nantje.paul@ferchau.com","PLM Integration Engineer (m\u002Ff\u002Fd) - München","Wir suchen einen erfahrenen PLM Integration Engineer für ein spannendes Projekt in der Luft- und Raumfahrt- sowie Verteidigungsindustrie in München. In dieser Position übernehmen Sie die Administration, Konfiguration und Wartung der PLM-Umgebung zur Unterstützung der Entwicklung komplexer Drohnensysteme.\n\nIhre Hauptaufgaben umfassen die Rolle als primäre Schnittstelle zwischen dem PLM-System und aktiven Engineering-Projekten, wobei Sie nahtlose Tool-Integration sicherstellen und Workflows an projektspezifische Anforderungen anpassen. Sie entwickeln und optimieren digitale Workflows innerhalb des PLM-Systems, einschließlich Release-Prozessen, ECR\u002FECO und Dokumentengenehmigungen.\n\nZu Ihren Verantwortlichkeiten gehört die Verwaltung kritischer Datenverbindungen zwischen PLM, CAD-Tools (MCAD\u002FECAD) und nachgelagerten ERP- oder Fertigungssystemen. Sie bieten praktische Fehlerbehebung, täglichen Benutzersupport und maßgeschneiderte PLM-Schulungen für interdisziplinäre Engineering-Teams.\n\nWir erwarten mindestens 5 Jahre Berufserfahrung in PLM-Administration oder Tool-Integration, vorzugsweise in der Luft- und Raumfahrt- oder Verteidigungsindustrie. Expertenwissen in der Konfiguration großer PLM\u002FPDM-Systeme (bevorzugt Siemens Teamcenter oder Solidworks PDM) sowie nachgewiesene Erfahrung in der Integration von PLM mit CAD-Tools und ERP-Plattformen sind erforderlich.\n\nSie verfügen über tiefgreifendes Verständnis von Hardware-Engineering-Prozessen, EBOM-Management und digitalen Produktlebenszyklen. Idealerweise bringen Sie Erfahrung in Systemanpassung, Scripting oder Datenmapping mit. Exzellente Kommunikationsfähigkeiten in englischer Sprache runden Ihr Profil ab.","en","FE34-23597-AVMUC","https:\u002F\u002Ftouch.ferchau.com\u002Fde\u002Fde\u002Fprojekt\u002F506290",{"items":39},[40,58,72,90,105,120,137,154,175,187,205,218,236,246,263],{"id":41,"slug":42,"title":43,"skills":44,"budget":21,"duration":53,"location":54,"onsitePercent":55,"contractType":25,"foundAt":56,"category":57},5628,"konzepterstellung-paletttierung","Konzepterstellung Paletttierung",[45,46,47,48,49,50,51,52],"Palettierung","Robotik","Cobot-Roboter","Konzepterstellung","Lastenheft","Analyse","Entwicklung","Mobilität","4 Monate","Aachen",50,"2026-05-22T15:26:19+00:00",{"id":28,"slug":29,"label":30},{"id":59,"slug":60,"title":61,"skills":62,"budget":21,"duration":21,"location":69,"onsitePercent":24,"contractType":25,"foundAt":70,"category":71},5513,"fertigungsplaner-mwd-3","Fertigungsplaner (m\u002Fw\u002Fd)",[63,18,64,65,66,67,68,50],"Produktionsplanung","Fertigungsprozesse","Musterfertigung","Dokumentation","Koordination","Optimierung","Erlangen","2026-05-22T14:26:19+00:00",{"id":28,"slug":29,"label":30},{"id":73,"slug":74,"title":75,"skills":76,"budget":21,"duration":21,"location":87,"onsitePercent":24,"contractType":25,"foundAt":88,"category":89},5512,"instandhalter-mechanik-mwd","Instandhalter - Mechanik (m\u002Fw\u002Fd)",[77,78,79,80,81,82,83,84,85,86,67,66],"Industriemechaniker","Mechanik","Pneumatik","Hydraulik","Elektrik","Elektrotechnik","Instandhaltung","Anlagen","Arbeitssicherheit","MS-Office","Oststeinbek","2026-05-22T14:26:04+00:00",{"id":28,"slug":29,"label":30},{"id":91,"slug":92,"title":93,"skills":94,"budget":21,"duration":100,"location":101,"onsitePercent":102,"contractType":25,"foundAt":103,"category":104},5493,"engineering-base-consultant-mwd","Engineering Base Consultant (m\u002Fw\u002Fd)",[95,96,97,98,99],"Engineering Base","Technische Dokumentation","Engineering-Prozesse","Planungsprozesse","Dokumentationsqualität","3-4 Monate (01.08.2026 - 31.12.2026)","Frankfurt am Main",80,"2026-05-22T13:50:30+00:00",{"id":28,"slug":29,"label":30},{"id":106,"slug":107,"title":108,"skills":109,"budget":21,"duration":21,"location":117,"onsitePercent":24,"contractType":25,"foundAt":118,"category":119},5472,"mechatroniker-mwd-kaeltetechnik","Mechatroniker (m\u002Fw\u002Fd) Kältetechnik",[84,66,110,111,112,113,68,114,115,116],"Inbetriebnahme","Klimatechnik","Kältetechnik","MSR","Regelungstechnik","Reparatur","Wartung","Mannheim","2026-05-22T13:27:44+00:00",{"id":28,"slug":29,"label":30},{"id":121,"slug":122,"title":123,"skills":124,"budget":21,"duration":21,"location":134,"onsitePercent":55,"contractType":25,"foundAt":135,"category":136},5469,"ce-dokumentation-druckgeraeterichtlinie-201468eu","CE-Dokumentation & Druckgeräterichtlinie (2014\u002F68\u002FEU)",[125,126,127,128,129,130,131,132,133,96],"CE-Dokumentation","Druckgeräterichtlinie","PED 2014\u002F68\u002FEU","Konformitätsbewertung","Risikoanalysen","Verfahrenstechnik","Anlagenbau","Maschinenbau","Qualitätssicherung","Münster","2026-05-22T13:27:02+00:00",{"id":28,"slug":29,"label":30},{"id":138,"slug":139,"title":140,"skills":141,"budget":21,"duration":21,"location":151,"onsitePercent":24,"contractType":25,"foundAt":152,"category":153},5467,"messtechniker-qualitaetssicherung-mwd","Messtechniker Qualitätssicherung (m\u002Fw\u002Fd)",[142,143,144,133,145,146,147,148,149,150],"Messtechnik","3D-Koordinatenmessmaschinen","PC-DMIS CAD++","EN 9102","ISO 9001","MS Excel","Technische Zeichnungen","Werkzeugmechaniker","Zerspanungsmechaniker","Pinneberg","2026-05-22T13:26:33+00:00",{"id":28,"slug":29,"label":30},{"id":155,"slug":156,"title":157,"skills":158,"budget":21,"duration":21,"location":172,"onsitePercent":24,"contractType":25,"foundAt":173,"category":174},5466,"projektleiter-verfahrenstechnik-mwd","Projektleiter Verfahrenstechnik (m\u002Fw\u002Fd)",[130,159,160,161,162,163,67,164,165,166,167,168,169,170,171],"Projektleitung","MS Project","Beschaffung","ChemCAD","Führung","Montageüberwachung","PRINCE2","Planung","Qualität","Risikomanagement","Simulationssoftware","Spezifikation","Umwelttechnik","Burgkirchen an der Alz","2026-05-22T13:26:18+00:00",{"id":28,"slug":29,"label":30},{"id":176,"slug":177,"title":178,"skills":179,"budget":21,"duration":21,"location":172,"onsitePercent":24,"contractType":25,"foundAt":185,"category":186},5465,"projektingenieur-verfahrenstechnik-mwd","Projektingenieur Verfahrenstechnik (m\u002Fw\u002Fd)",[130,131,162,180,181,182,160,183,170,184,110],"Aspen Plus","Bilanzierung","Druckverlustberechnung","Projektmanagement","Auslegung","2026-05-22T13:26:03+00:00",{"id":28,"slug":29,"label":30},{"id":188,"slug":189,"title":190,"skills":191,"budget":21,"duration":201,"location":202,"onsitePercent":24,"contractType":25,"foundAt":203,"category":204},5446,"fertigungsplaner-in-montage-mwd","Fertigungsplaner\u002F-in Montage (m\u002Fw\u002Fd)",[192,193,194,195,196,197,198,199,200],"Ingenieurstudium Mechanik\u002FProduktion","Fertigungs- und Montageplanung","Projekterfahrung","Wertstrom- und Linienplanung","BPS","MTM-Zeitwirtschaft","SAP CAPP","Deutsch","Englisch","10-12 months","Plochingen","2026-05-22T12:28:25+00:00",{"id":28,"slug":29,"label":30},{"id":206,"slug":207,"title":208,"skills":209,"budget":21,"duration":21,"location":215,"onsitePercent":24,"contractType":25,"foundAt":216,"category":217},5442,"industriemechaniker-sondermaschinenbau-mwd","Industriemechaniker Sondermaschinenbau (m\u002Fw\u002Fd)",[77,210,211,132,84,110,212,18,213,133,214,66],"Sondermaschinenbau","Montage","Schweißen","ERP","MS Office","Salzgitter","2026-05-22T12:26:40+00:00",{"id":28,"slug":29,"label":30},{"id":219,"slug":220,"title":221,"skills":222,"budget":21,"duration":22,"location":23,"onsitePercent":24,"contractType":25,"foundAt":234,"category":235},5441,"stress-dynamics-engineer-mfd-muenchen-on-site","Stress & Dynamics Engineer (m\u002Ff\u002Fd) - München on site",[223,224,225,226,227,228,229,230,231,232,233],"CAD","Documentation","Dynamics","Simulation","Simulink","Test","Test planning","Matlab","FEA simulation","Solidworks Simulation","Simcenter","2026-05-22T12:26:24+00:00",{"id":28,"slug":29,"label":30},{"id":237,"slug":238,"title":239,"skills":240,"budget":21,"duration":21,"location":23,"onsitePercent":24,"contractType":25,"foundAt":244,"category":245},5440,"technischer-produktdesigner-maschinenbau-mwd-3","Technischer Produktdesigner Maschinenbau (m\u002Fw\u002Fd)",[131,223,241,66,132,68,18,242,243],"Detaillierung","Solid Edge","SolidWorks","2026-05-22T12:26:09+00:00",{"id":28,"slug":29,"label":30},{"id":247,"slug":248,"title":249,"skills":250,"budget":259,"duration":260,"location":21,"onsitePercent":21,"contractType":25,"foundAt":261,"category":262},5415,"layouter-im-intralogistik-bereich","Layouter im Intralogistik-Bereich",[251,252,253,254,255,256,257,258],"INVENTOR","Factory Design Utilities","Autodesk Vault","CATIA","Intralogistik","3D Layouts","Fördertechnik","Regalbediengeräte","auf Anfrage","6 Monate ++","2026-05-22T10:31:07+00:00",{"id":28,"slug":29,"label":30},{"id":264,"slug":265,"title":266,"skills":267,"budget":21,"duration":21,"location":275,"onsitePercent":24,"contractType":25,"foundAt":276,"category":277},5406,"technischer-sachbearbeiter-mwd-2","Technischer Sachbearbeiter (m\u002Fw\u002Fd)",[132,268,269,18,270,271,272,273,96,274],"Rohrleitungsbau","AutoCAD","Teamcenter PLM","DIN 2303","Antriebe","Armaturen","Verifikationsmanagement","Kiel","2026-05-22T10:28:27+00:00",{"id":28,"slug":29,"label":30}]