[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"project-hardware-engineer-safety-ic-mwd":3,"similar-hardware-engineer-safety-ic-mwd":34},{"id":4,"slug":5,"title":6,"skills":7,"budget":20,"duration":20,"location":21,"onsitePercent":22,"contractType":23,"foundAt":24,"category":25,"description":29,"rawText":30,"language":31,"projectId":32,"sourceUrl":33},3367,"hardware-engineer-safety-ic-mwd","Hardware Engineer Safety I&C (m\u002Fw\u002Fd)",[8,9,10,11,12,13,14,15,16,17,18,19],"AutoCAD","Automatisierungstechnik","EPLAN","EPLAN P8","Elektrotechnik","Excel","IEC 61508","Leittechnik","MS-Office","SAP","Sicherheitsnormen","Dokumentenmanagementsysteme",null,"Erlangen",50,"contracting","2026-05-18T12:25:29+00:00",{"id":26,"slug":27,"label":28},10,"electrical","Elektrotechnik & Elektronik","Erstellung von Fertigungsunterlagen für Schaltschränke, Berechnung elektrischer Parameter und Umsetzung sicherheitsrelevanter Anforderungen im Bereich Leittechnik. Verwaltung technischer Dokumente und Abstimmung mit Fertigung, Prüffeld und Inbetriebnahme.","Hardware Engineer Safety I&C (m\u002Fw\u002Fd)\nProjektnummer: FE71-87118-N\nStandort: Erlangen, Bayern\nArbeitsweise: Hybrid\nLaufzeit: Keine Angabe\nStartdatum: Keine Angabe\n\nDiese Herausforderungen übernimmst du:\n- Erstellung von Fertigungsunterlagen für Schaltschränke basierend auf funktionalen Vorgaben und qualifizierten Hardwareplattformen \n\n- Berechnung elektrischer Parameter wie Stromaufnahme, Verlustleistung und Spannungsabfall sowie Abschätzung der Schaltschranktemperaturen \n\n- Verwaltung technischer Dokumente mit Dokumentenmanagementsystemen wie SAP DMS oder OpenText \n\n- Abstimmung mit den Bereichen Fertigung, Prüffeld und Inbetriebnahme zur Sicherstellung vollständiger Kundendokumentation \n\n- Umsetzung sicherheitsrelevanter Anforderungen im Bereich Leittechnik nach gängigen Normen (z. B. IEC 61508) \n\n- Erstellung von Stücklisten und technischen Zeichnungen mit Tools wie EPLAN oder AutoCAD Electrical \n\n- Durchführung technischer Klärungen mit internen Fachabteilungen und externen Partner:innen \n\n- Unterstützung bei der Fehleranalyse während Produktion, Test und Inbetriebnahmephase\n\nUnsere Erwartungen an dich:\n- Abgeschlossenes Bachelorstudium in Elektrotechnik, Automatisierungstechnik oder vergleichbar\n\n- Erste praktische Erfahrungen im Kraftwerksbau oder in der Sicherheitsleittechnik\n\n- Kenntnisse im Umgang mit Konstruktionssoftware wie EPLAN P8, AutoCAD Electrical\n\n- Erfahrung in der Arbeit mit Dokumentations- bzw. DMS-Systemen\n\n- Grundlagenkenntnisse zu einschlägigen Sicherheitsnormen für Leittechniksysteme\n\n- Anwenderkenntnisse MS-Office (Word, Excel, PowerPoint)\n\n- Fließend Deutsch sowie gute Englischkenntnisse\n\nNote:\n\nPlease be aware that German is the working language in our project and good German language skills (level B2+) are a prerequisite for the position.\n\nSkills: AutoCAD, Automatisierungstechnik, Berechnung, C, EPLAN, EPLAN P8, Elektrotechnik, Excel, Fehleranalyse, Fertigung, IEC, IEC 61508, Inbetriebnahme, Leittechnik, MS, MS-Office, Produktion, SAP, Test, Umsetzung\n\nAnsprechpartner:\nBeerot Mimo\nWerkstudentin Bewerbermanagement\nFERCHAU GmbH, Niederlassung Nürnberg-City\nMarienbergstraße 94\n90411 Nürnberg\n+49 911 64138-0\nnuernberg-city@ferchau.com","de","FE71-87118-N","https:\u002F\u002Ftouch.ferchau.com\u002Fde\u002Fde\u002Fprojekt\u002F505585",{"items":35},[36,53,72,94,109],{"id":37,"slug":38,"title":39,"skills":40,"budget":20,"duration":49,"location":50,"onsitePercent":20,"contractType":23,"foundAt":51,"category":52},4909,"experte-mwd-ursachenanalyse-elektronik-fertigung","Experte (m\u002Fw\u002Fd) Ursachenanalyse - Elektronik & Fertigung",[41,42,43,44,45,46,47,48],"Elektronik","Embedded Systems","Komparator-Schaltungen","Hardware-Fertigung","Lean Six Sigma","Qualitätsmanagement","Prozessoptimierung","Root-Cause-Analysis","3 Monate","Aachen","2026-05-20T16:35:28+00:00",{"id":26,"slug":27,"label":28},{"id":54,"slug":55,"title":56,"skills":57,"budget":20,"duration":68,"location":20,"onsitePercent":69,"contractType":23,"foundAt":70,"category":71},4895,"hardware-entwicklungsingenieur-fuer-analog-digital-signalelektronik-im-luftfahrtbereich-2","Hardware Entwicklungsingenieur für Analog-\u002FDigital-\u002FSignalelektronik im Luftfahrtbereich",[12,58,59,60,61,62,63,64,65,66,67],"Hardware-Auslegung","Signalelektronik","analoge Schaltungstechnik","digitale Schaltungstechnik","FPGA","PLD","Datenbussysteme","RTCA Do-254","Luftfahrtentwicklungsprozess","Englisch","2 Monate ++",80,"2026-05-20T15:30:25+00:00",{"id":26,"slug":27,"label":28},{"id":73,"slug":74,"title":75,"skills":76,"budget":20,"duration":89,"location":90,"onsitePercent":20,"contractType":91,"foundAt":92,"category":93},4894,"leittechnik-ingenieur-fuer-unterwerkeumspannwerke","Leittechnik-Ingenieur für Unterwerke\u002FUmspannwerke",[12,77,9,78,79,80,81,82,83,84,85,86,87,88],"Energietechnik","IEC61850","IEC60870-5-101","IEC60870-5-104","Modbus TCP\u002FRTU","Stationsleittechnik","Fernwirktechnik","Unterwerksautomation","OT-Security","Siemens Toolbox 2","Siemens SCC","Siemens Device Manager","6-9 Monate","Nordschweiz","temp_work","2026-05-20T15:30:19+00:00",{"id":26,"slug":27,"label":28},{"id":95,"slug":96,"title":97,"skills":98,"budget":20,"duration":20,"location":105,"onsitePercent":106,"contractType":23,"foundAt":107,"category":108},4891,"elektriker-mwd","Elektriker (m\u002Fw\u002Fd)",[12,99,100,101,102,15,103,104],"Betriebstechnik","Gebäudetechnik","Instandhaltung","Wartung","Steuerung","Anlagen","Regensburg",100,"2026-05-20T15:25:29+00:00",{"id":26,"slug":27,"label":28},{"id":110,"slug":111,"title":112,"skills":113,"budget":20,"duration":119,"location":120,"onsitePercent":20,"contractType":23,"foundAt":121,"category":122},4878,"technischer-zeichner-fuer-elektroplanung-und-hls","Technischer Zeichner für Elektroplanung und HLS",[8,114,115,116,117,118],"Technisches Zeichnen","DWG","Elektroplanung","Heizung und Lüftung","HLS","18 Monate","Ingolstadt","2026-05-20T14:30:23+00:00",{"id":26,"slug":27,"label":28}]