[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"project-fertigungsplaner-mwd-3":3,"similar-fertigungsplaner-mwd-3":31},{"id":4,"slug":5,"title":6,"skills":7,"budget":16,"duration":16,"location":17,"onsitePercent":18,"contractType":19,"foundAt":20,"category":21,"description":25,"rawText":26,"webTitle":6,"webText":27,"language":28,"projectId":29,"sourceUrl":30},5513,"fertigungsplaner-mwd-3","Fertigungsplaner (m\u002Fw\u002Fd)",[8,9,10,11,12,13,14,15],"Produktionsplanung","SAP","Fertigungsprozesse","Musterfertigung","Dokumentation","Koordination","Optimierung","Analyse",null,"Erlangen",100,"contracting","2026-05-22T14:26:19+00:00",{"id":22,"slug":23,"label":24},9,"mechanical","Maschinenbau & Konstruktion","Planung, Steuerung und Umsetzung der Einführung neuer Produkte in die Fertigung. Koordination der Musterfertigung bis zur Serienreife und Optimierung von Fertigungsprozessen. Abstimmung mit Entwicklung, Konstruktion und externen Partnern.","Fertigungsplaner (m\u002Fw\u002Fd)\nProjektnummer: FE84-40165-NLST\nStandort: Erlangen, Bayern\nArbeitsweise: Vor Ort\nLaufzeit: Keine Angabe\nStartdatum: Keine Angabe\n\nDein Aufgabengebiet:\n- Planung, Steuerung und Umsetzung der Einführung neuer Produkte in die Fertigung unter Berücksichtigung von Kosten, Qualität und Terminen\n\n- Koordination und Optimierung der Musterfertigung bis zur Serienreife\n\n- Erstellung und Pflege von Fertigungsunterlagen sowie Dokumentation des Musterbaus\n\n- Abstimmung mit Entwicklung, Konstruktion und externen Partnern zur Klärung technischer Anforderungen\n\n- Analyse und kontinuierliche Optimierung von Fertigungsprozessen sowie Feinplanung von Abläufen\n\nDein Profil:\n- Abgeschlossenes Studium (Bachelor) im Ingenieurwesen oder Weiterbildung zum Techniker mit erster Berufserfahrung\n\n- Kenntnisse in der Produktionsplanung und -steuerung, idealerweise im Bereich Computer- bzw. Elektronikfertigung\n\n- Erfahrung im Umgang mit relevanten Tools wie SAP, SAP ME oder ähnlichen Systemen\n\n- Strukturierte, selbstständige Arbeitsweise sowie wirtschaftliches Denken\n\n- Sehr gute Deutsch- und gute Englischkenntnisse\n\nSkills: Analyse, Arbeitsweise, Dokumentation, Entwicklung, Fertigung, Konstruktion, Koordination, Optimierung, Planung, Produktionsplanung, Qualität, SAP, Steuerung, Umsetzung\n\nAnsprechpartner:\nPatrick Heininger\nJunior Talent Acquisition Specialist\nFERCHAU GmbH, Niederlassung Nürnberg Life Science & Technology\nMarienbergstraße 94\n90411 Nürnberg\n+49 911 64138-10\nnuernberg-lst@ferchau.com","Wir suchen einen engagierten Fertigungsplaner (m\u002Fw\u002Fd) für unseren Standort in Erlangen, Bayern. In dieser Position übernehmen Sie die verantwortungsvolle Aufgabe der Planung, Steuerung und Umsetzung bei der Einführung neuer Produkte in die Fertigung. Dabei behalten Sie stets die wichtigen Faktoren Kosten, Qualität und Termine im Blick.\n\nZu Ihren Hauptaufgaben gehört die Koordination und Optimierung der Musterfertigung bis zur Serienreife. Sie erstellen und pflegen Fertigungsunterlagen und dokumentieren den gesamten Musterbau. Dabei arbeiten Sie eng mit den Bereichen Entwicklung, Konstruktion und externen Partnern zusammen, um technische Anforderungen zu klären und optimale Lösungen zu entwickeln.\n\nEin weiterer Schwerpunkt Ihrer Tätigkeit liegt in der kontinuierlichen Analyse und Optimierung von Fertigungsprozessen sowie der Feinplanung von Arbeitsabläufen. Hierbei bringen Sie Ihre analytischen Fähigkeiten ein, um Effizienzsteigerungen zu identifizieren und umzusetzen.\n\nWir erwarten von Ihnen ein abgeschlossenes Studium (Bachelor) im Ingenieurwesen oder eine Weiterbildung zum Techniker mit erster Berufserfahrung. Kenntnisse in der Produktionsplanung und -steuerung sind erforderlich, idealerweise im Bereich Computer- oder Elektronikfertigung. Erfahrung im Umgang mit SAP, SAP ME oder ähnlichen Systemen runden Ihr Profil ab.\n\nSie zeichnen sich durch eine strukturierte, selbstständige Arbeitsweise und wirtschaftliches Denken aus. Sehr gute Deutschkenntnisse und gute Englischkenntnisse sind für diese Position erforderlich.","de","FE84-40165-NLST","https:\u002F\u002Ftouch.ferchau.com\u002Fde\u002Fde\u002Fprojekt\u002F506335",{"items":32},[33,50,68,83,98,115,132,153,165,183,196,216,226,243,258],{"id":34,"slug":35,"title":36,"skills":37,"budget":16,"duration":45,"location":46,"onsitePercent":47,"contractType":19,"foundAt":48,"category":49},5628,"konzepterstellung-paletttierung","Konzepterstellung Paletttierung",[38,39,40,41,42,15,43,44],"Palettierung","Robotik","Cobot-Roboter","Konzepterstellung","Lastenheft","Entwicklung","Mobilität","4 Monate","Aachen",50,"2026-05-22T15:26:19+00:00",{"id":22,"slug":23,"label":24},{"id":51,"slug":52,"title":53,"skills":54,"budget":16,"duration":16,"location":65,"onsitePercent":18,"contractType":19,"foundAt":66,"category":67},5512,"instandhalter-mechanik-mwd","Instandhalter - Mechanik (m\u002Fw\u002Fd)",[55,56,57,58,59,60,61,62,63,64,13,12],"Industriemechaniker","Mechanik","Pneumatik","Hydraulik","Elektrik","Elektrotechnik","Instandhaltung","Anlagen","Arbeitssicherheit","MS-Office","Oststeinbek","2026-05-22T14:26:04+00:00",{"id":22,"slug":23,"label":24},{"id":69,"slug":70,"title":71,"skills":72,"budget":16,"duration":78,"location":79,"onsitePercent":80,"contractType":19,"foundAt":81,"category":82},5493,"engineering-base-consultant-mwd","Engineering Base Consultant (m\u002Fw\u002Fd)",[73,74,75,76,77],"Engineering Base","Technische Dokumentation","Engineering-Prozesse","Planungsprozesse","Dokumentationsqualität","3-4 Monate (01.08.2026 - 31.12.2026)","Frankfurt am Main",80,"2026-05-22T13:50:30+00:00",{"id":22,"slug":23,"label":24},{"id":84,"slug":85,"title":86,"skills":87,"budget":16,"duration":16,"location":95,"onsitePercent":18,"contractType":19,"foundAt":96,"category":97},5472,"mechatroniker-mwd-kaeltetechnik","Mechatroniker (m\u002Fw\u002Fd) Kältetechnik",[62,12,88,89,90,91,14,92,93,94],"Inbetriebnahme","Klimatechnik","Kältetechnik","MSR","Regelungstechnik","Reparatur","Wartung","Mannheim","2026-05-22T13:27:44+00:00",{"id":22,"slug":23,"label":24},{"id":99,"slug":100,"title":101,"skills":102,"budget":16,"duration":16,"location":112,"onsitePercent":47,"contractType":19,"foundAt":113,"category":114},5469,"ce-dokumentation-druckgeraeterichtlinie-201468eu","CE-Dokumentation & Druckgeräterichtlinie (2014\u002F68\u002FEU)",[103,104,105,106,107,108,109,110,111,74],"CE-Dokumentation","Druckgeräterichtlinie","PED 2014\u002F68\u002FEU","Konformitätsbewertung","Risikoanalysen","Verfahrenstechnik","Anlagenbau","Maschinenbau","Qualitätssicherung","Münster","2026-05-22T13:27:02+00:00",{"id":22,"slug":23,"label":24},{"id":116,"slug":117,"title":118,"skills":119,"budget":16,"duration":16,"location":129,"onsitePercent":18,"contractType":19,"foundAt":130,"category":131},5467,"messtechniker-qualitaetssicherung-mwd","Messtechniker Qualitätssicherung (m\u002Fw\u002Fd)",[120,121,122,111,123,124,125,126,127,128],"Messtechnik","3D-Koordinatenmessmaschinen","PC-DMIS CAD++","EN 9102","ISO 9001","MS Excel","Technische Zeichnungen","Werkzeugmechaniker","Zerspanungsmechaniker","Pinneberg","2026-05-22T13:26:33+00:00",{"id":22,"slug":23,"label":24},{"id":133,"slug":134,"title":135,"skills":136,"budget":16,"duration":16,"location":150,"onsitePercent":18,"contractType":19,"foundAt":151,"category":152},5466,"projektleiter-verfahrenstechnik-mwd","Projektleiter Verfahrenstechnik (m\u002Fw\u002Fd)",[108,137,138,139,140,141,13,142,143,144,145,146,147,148,149],"Projektleitung","MS Project","Beschaffung","ChemCAD","Führung","Montageüberwachung","PRINCE2","Planung","Qualität","Risikomanagement","Simulationssoftware","Spezifikation","Umwelttechnik","Burgkirchen an der Alz","2026-05-22T13:26:18+00:00",{"id":22,"slug":23,"label":24},{"id":154,"slug":155,"title":156,"skills":157,"budget":16,"duration":16,"location":150,"onsitePercent":18,"contractType":19,"foundAt":163,"category":164},5465,"projektingenieur-verfahrenstechnik-mwd","Projektingenieur Verfahrenstechnik (m\u002Fw\u002Fd)",[108,109,140,158,159,160,138,161,148,162,88],"Aspen Plus","Bilanzierung","Druckverlustberechnung","Projektmanagement","Auslegung","2026-05-22T13:26:03+00:00",{"id":22,"slug":23,"label":24},{"id":166,"slug":167,"title":168,"skills":169,"budget":16,"duration":179,"location":180,"onsitePercent":18,"contractType":19,"foundAt":181,"category":182},5446,"fertigungsplaner-in-montage-mwd","Fertigungsplaner\u002F-in Montage (m\u002Fw\u002Fd)",[170,171,172,173,174,175,176,177,178],"Ingenieurstudium Mechanik\u002FProduktion","Fertigungs- und Montageplanung","Projekterfahrung","Wertstrom- und Linienplanung","BPS","MTM-Zeitwirtschaft","SAP CAPP","Deutsch","Englisch","10-12 months","Plochingen","2026-05-22T12:28:25+00:00",{"id":22,"slug":23,"label":24},{"id":184,"slug":185,"title":186,"skills":187,"budget":16,"duration":16,"location":193,"onsitePercent":18,"contractType":19,"foundAt":194,"category":195},5442,"industriemechaniker-sondermaschinenbau-mwd","Industriemechaniker Sondermaschinenbau (m\u002Fw\u002Fd)",[55,188,189,110,62,88,190,9,191,111,192,12],"Sondermaschinenbau","Montage","Schweißen","ERP","MS Office","Salzgitter","2026-05-22T12:26:40+00:00",{"id":22,"slug":23,"label":24},{"id":197,"slug":198,"title":199,"skills":200,"budget":16,"duration":212,"location":213,"onsitePercent":18,"contractType":19,"foundAt":214,"category":215},5441,"stress-dynamics-engineer-mfd-muenchen-on-site","Stress & Dynamics Engineer (m\u002Ff\u002Fd) - München on site",[201,202,203,204,205,206,207,208,209,210,211],"CAD","Documentation","Dynamics","Simulation","Simulink","Test","Test planning","Matlab","FEA simulation","Solidworks Simulation","Simcenter","3-5 Monate","München","2026-05-22T12:26:24+00:00",{"id":22,"slug":23,"label":24},{"id":217,"slug":218,"title":219,"skills":220,"budget":16,"duration":16,"location":213,"onsitePercent":18,"contractType":19,"foundAt":224,"category":225},5440,"technischer-produktdesigner-maschinenbau-mwd-3","Technischer Produktdesigner Maschinenbau (m\u002Fw\u002Fd)",[109,201,221,12,110,14,9,222,223],"Detaillierung","Solid Edge","SolidWorks","2026-05-22T12:26:09+00:00",{"id":22,"slug":23,"label":24},{"id":227,"slug":228,"title":229,"skills":230,"budget":239,"duration":240,"location":16,"onsitePercent":16,"contractType":19,"foundAt":241,"category":242},5415,"layouter-im-intralogistik-bereich","Layouter im Intralogistik-Bereich",[231,232,233,234,235,236,237,238],"INVENTOR","Factory Design Utilities","Autodesk Vault","CATIA","Intralogistik","3D Layouts","Fördertechnik","Regalbediengeräte","auf Anfrage","6 Monate ++","2026-05-22T10:31:07+00:00",{"id":22,"slug":23,"label":24},{"id":244,"slug":245,"title":246,"skills":247,"budget":16,"duration":16,"location":255,"onsitePercent":18,"contractType":19,"foundAt":256,"category":257},5406,"technischer-sachbearbeiter-mwd-2","Technischer Sachbearbeiter (m\u002Fw\u002Fd)",[110,248,249,9,250,251,252,253,74,254],"Rohrleitungsbau","AutoCAD","Teamcenter PLM","DIN 2303","Antriebe","Armaturen","Verifikationsmanagement","Kiel","2026-05-22T10:28:27+00:00",{"id":22,"slug":23,"label":24},{"id":259,"slug":260,"title":261,"skills":262,"budget":16,"duration":212,"location":213,"onsitePercent":18,"contractType":19,"foundAt":273,"category":274},5400,"mechanical-designer-packaging-human-factors-mfd-muenchen-on-site","Mechanical Designer - Packaging & Human Factors (m\u002Ff\u002Fd) - München on site",[201,263,264,265,266,267,268,269,270,271,272],"DMU","Design","Electronics","Mechanical","NX","Siemens NX","Solidworks","Human Factors","Ergonomics","Ruggedization","2026-05-22T10:26:59+00:00",{"id":22,"slug":23,"label":24}]