[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"project-creo-konstrukteur-ptc-creo-parametric-11":3,"similar-creo-konstrukteur-ptc-creo-parametric-11":34},{"id":4,"slug":5,"title":6,"skills":7,"budget":17,"duration":18,"location":19,"onsitePercent":20,"contractType":21,"foundAt":22,"category":23,"description":27,"rawText":28,"webTitle":29,"webText":30,"language":31,"projectId":32,"sourceUrl":33},11997,"creo-konstrukteur-ptc-creo-parametric-11","Creo Konstrukteur (PTC Creo Parametric 11)",[8,9,10,11,12,13,14,15,16],"PTC Creo Parametric 11","CAD","PLM\u002FAgile-PLM 6.21","SAP","Windchill","ISO 14405","ISO 2768","DIN EN ISO 10110","Technische Dokumentation","VB","6 Monate +","Hessen",50,"contracting","2026-06-10T07:30:16+00:00",{"id":24,"slug":25,"label":26},9,"mechanical","Maschinenbau & Konstruktion","Erfahrener Creo Konstrukteur für einen hessischen Premiumhersteller gesucht. Aufgaben umfassen Überführung von mechanischen Zeichnungen in PTC Creo Parametric 11, Umstellung auf bleifreie Materialien, Erstellung von 3D-\u002F2D-Teilen und Baugruppen sowie Verwaltung in Agile-PLM und SAP.","Ein hessischer Premiumhersteller ist aktuell auf der Suche nach einem erfahrenen Creo Konstrukteur.\n\nIhre Aufgaben:\n\n- Überführung von mechanischen Zeichnungen (Pergament oder AutoCAD) in das CAD-System PTC Creo Parametric 11. \n\n- Analyse der vorhandenen Spezifikationen und Umsetzung der Vorgaben bzgl. Umstellung von bleihaltigen Materialien auf bleifreie Materialien\n\n- Erstellung neuer 3D- und 2D-Einzelteile sowie Baugruppen auf Basis der alten Zeichnungen unter Berücksichtigung der Normen ISO 14405 (E), ISO 2768-mH und DIN EN ISO 10110. \n\n- Speicherung, Versionierung und Verwaltung von 2D- und 3D-Dokumenten in Agile-PLM 6.21. \n\n- Erstellung von Änderungskarten und eigenständige Suche sowie Verwaltung von Dokumenten in Agile-PLM 6.21. \n\n- Bearbeitung von Stammdaten, Erstellung und Änderung von Stücklisten sowie Arbeitsplänen und Revisionsständen in SAP. \n\n- Erstellung einer technischen Dokumentation über die durchgeführten Arbeiten und Ergebnisse.\n\n Anforderungen: \n + fundierte Projekterfahrung mit Creo Parametrics 11\n\n+ Erfahrung im DMS-System PLM\n\n+ idealerweise Kenntnisse in Windchil (Umstellung ist geplant)\n\n+ Grundkenntnisse in SAP\n\n Zusätzliche Informationen: \n Konnten wir Ihr Interesse wecken? Dann freuen wir uns auf die Zusendung Ihres aussagekräftigen Expertenprofils unter Angabe Ihrer Stundensatzvorstellung. \n\n Projekt-Nr.: \n106393\n\nStellentyp: \nfreiberuflich\n\nEinsatzort: \nD3, vor Ort und remote\n\nStart: \nab Juli, Vollzeit\n\nDauer: \n6 Monate +","Creo Konstrukteur (m\u002Fw\u002Fd) – CAD-Modellierung und Dokumentation","Ein renommierter Premiumhersteller in Hessen sucht einen erfahrenen Creo Konstrukteur zur Unterstützung bei der Digitalisierung und Modernisierung seiner Konstruktionsprozesse.\n\nIhre Aufgaben:\n- Überführung von mechanischen Zeichnungen (Papiervorlagen und AutoCAD-Dateien) in das CAD-System PTC Creo Parametric 11\n- Analyse und Umsetzung von Materialumstellungen (Übergang von bleihaltigen zu bleifreien Materialien)\n- Erstellung von 3D- und 2D-Einzelteilen sowie Baugruppen unter Berücksichtigung relevanter Normen (ISO 14405, ISO 2768, DIN EN ISO 10110)\n- Verwaltung von Konstruktionsdokumenten im PLM-System (Versionierung, Archivierung, Änderungsverwaltung)\n- Bearbeitung von Stammdaten, Stücklisten und Arbeitsplänen in SAP\n- Erstellung technischer Dokumentation\n\nAnforderungen:\n- Fundierte Projekterfahrung mit Creo Parametric 11\n- Erfahrung mit PLM-Systemen (DMS)\n- Idealerweise Kenntnisse in Windchill\n- Grundkenntnisse in SAP\n- Sicherer Umgang mit technischen Normen und Spezifikationen\n\nEinsatzdetails:\nVollzeitposition mit flexiblen Arbeitsmodellen (vor Ort und remote möglich). Projektstart ab Juli, Laufzeit mindestens 6 Monate. Freiberufliche Zusammenarbeit auf Stundensatzbasis.","de","106393","https:\u002F\u002Fwww.solcom.de\u002Fde\u002Fprojektportal\u002Fprojektangebote\u002Fkonstrukteur-creo-parametrics-m-w-d-106393?utm_source=RSS&utm_medium=RSS&utm_campaign=RSS-Feed",{"items":35},[36,58,71,88,101,114,128,144,158,169,183,196,216,229,241],{"id":37,"slug":38,"title":39,"skills":40,"budget":53,"duration":54,"location":53,"onsitePercent":55,"contractType":21,"foundAt":56,"category":57},12038,"ingenieur-versorgungstechnik-battery-shop-erweiterung-remote","Ingenieur Versorgungstechnik - Battery Shop Erweiterung (Remote)",[41,42,43,44,45,46,47,48,49,50,51,52],"Mechanical Engineering","Versorgungstechnik","Revit","AutoCAD","P&ID-Erstellung","3D-Modellierung","LPH3\u002FLPH5 Planung","Bill of Quantities","Pipe Stress Analysis","Technische Berechnungen","Englisch (fließend)","Deutsch (technisch)",null,"3 Monate +",0,"2026-06-10T09:30:25+00:00",{"id":24,"slug":25,"label":26},{"id":59,"slug":60,"title":61,"skills":62,"budget":17,"duration":54,"location":68,"onsitePercent":55,"contractType":21,"foundAt":69,"category":70},12037,"technischer-zeichner-revit-cad-designer-mechanical-im-anlagenbau","Technischer Zeichner \u002F Revit \u002F CAD Designer Mechanical im Anlagenbau",[43,44,46,63,64,65,66,67],"Technisches Zeichnen","CAD Design","Bill of Quantities (BOQ)","P&ID","Modellbasierte Mengenermittlung","Grünheide (Mark)","2026-06-10T09:30:16+00:00",{"id":24,"slug":25,"label":26},{"id":72,"slug":73,"title":74,"skills":75,"budget":53,"duration":53,"location":85,"onsitePercent":20,"contractType":21,"foundAt":86,"category":87},12034,"konstrukteur-kran-und-hebesysteme-mwd","Konstrukteur Kran- und Hebesysteme (m\u002Fw\u002Fd)",[76,77,9,78,44,79,80,81,82,83,84],"Maschinenbau","Konstruktion","SolidWorks","FEM","EN 13001","DIN Normen","Krantechnik","Hebezeugen","Teamfähigkeit","Weinsberg, Baden-Württemberg","2026-06-10T09:26:28+00:00",{"id":24,"slug":25,"label":26},{"id":89,"slug":90,"title":91,"skills":92,"budget":53,"duration":54,"location":53,"onsitePercent":55,"contractType":21,"foundAt":99,"category":100},12020,"mechanical-engineer-versorgungstechnik-medienversorgungssysteme","Mechanical Engineer Versorgungstechnik - Medienversorgungssysteme",[76,42,93,94,45,44,95,96,97,48,43,98],"Druckluftversorgung","Erdgasversorgung","Systemauslegung","Berechnung","HOAI LPH3 LPH5","Englisch","2026-06-10T08:30:37+00:00",{"id":24,"slug":25,"label":26},{"id":102,"slug":103,"title":104,"skills":105,"budget":53,"duration":53,"location":111,"onsitePercent":20,"contractType":21,"foundAt":112,"category":113},12014,"konstrukteur-anlagenbau-mwd","Konstrukteur Anlagenbau (m\u002Fw\u002Fd)",[106,77,107,108,109,110,98],"Anlagenbau","3D-Tools","Planung","Projektierung","Deutsch","Wörgl, Tirol","2026-06-10T08:26:27+00:00",{"id":24,"slug":25,"label":26},{"id":115,"slug":116,"title":117,"skills":118,"budget":53,"duration":53,"location":125,"onsitePercent":20,"contractType":21,"foundAt":126,"category":127},12012,"ingenieur-schienenfahrzeugtechnik-mwd","Ingenieur Schienenfahrzeugtechnik (m\u002Fw\u002Fd)",[119,77,120,76,121,122,123,124,110,98],"Schienenfahrzeugtechnik","System Engineering","Mechatronik","Elektrotechnik","Berechnung mechanischer Bauteile","Auslegung","Innsbruck","2026-06-10T08:26:10+00:00",{"id":24,"slug":25,"label":26},{"id":129,"slug":130,"title":131,"skills":132,"budget":53,"duration":53,"location":140,"onsitePercent":141,"contractType":21,"foundAt":142,"category":143},11994,"kunststoff-verfahrenstechniker-spritzguss-kunststoffverarbeitung-mwd","Kunststoff-Verfahrenstechniker Spritzguss Kunststoffverarbeitung (m\u002Fw\u002Fd)",[133,134,135,136,137,138,139],"Spritzguss","Kunststofftechnik","Kunststoffverarbeitung","MS-Office","Anlagensteuerung","Prozessoptimierung","Qualitätssicherung","Meran, Südtirol",100,"2026-06-10T06:26:57+00:00",{"id":24,"slug":25,"label":26},{"id":145,"slug":146,"title":147,"skills":148,"budget":53,"duration":53,"location":154,"onsitePercent":141,"contractType":155,"foundAt":156,"category":157},11992,"fachkraft-spritzgussfertigung-mwd","Fachkraft Spritzgussfertigung (m\u002Fw\u002Fd)",[149,150,11,151,152,153],"Spritzgussmaschinen","Qualitätsmanagement","Analyse","Koordination","Schichtarbeit","Bozen, Südtirol","permanent","2026-06-10T06:26:43+00:00",{"id":24,"slug":25,"label":26},{"id":159,"slug":160,"title":161,"skills":162,"budget":53,"duration":53,"location":125,"onsitePercent":20,"contractType":21,"foundAt":167,"category":168},11990,"verfahrenstechniker-prozessoptimierung-mwd","Verfahrenstechniker Prozessoptimierung (m\u002Fw\u002Fd)",[163,138,164,165,16,166,84,110,98],"Verfahrenstechnik","Prozessüberwachung","Prozesssteuerung","Produktionsprozesse","2026-06-10T06:26:30+00:00",{"id":24,"slug":25,"label":26},{"id":170,"slug":171,"title":172,"skills":173,"budget":53,"duration":53,"location":180,"onsitePercent":141,"contractType":21,"foundAt":181,"category":182},11954,"rd-support-testing-mwd","R&D Support Testing (m\u002Fw\u002Fd)",[174,151,175,176,177,178,84,179],"Industriemechaniker","Dokumentation","Testing","R&D","Sicherheit","Kommunikation","Kaufering, Bayern","2026-06-09T16:25:31+00:00",{"id":24,"slug":25,"label":26},{"id":184,"slug":185,"title":186,"skills":187,"budget":53,"duration":53,"location":193,"onsitePercent":141,"contractType":21,"foundAt":194,"category":195},11951,"prozessingenieur-serienbegleitung-anlagenstabilisierung-2","Prozessingenieur - Serienbegleitung & Anlagenstabilisierung",[138,188,189,190,191,139,192],"Ursachenanalyse","8D-Methode","Six Sigma","Anlagenoptimierung","Produktionstechnik","Lohne","2026-06-09T16:16:04+00:00",{"id":24,"slug":25,"label":26},{"id":197,"slug":198,"title":199,"skills":200,"budget":17,"duration":213,"location":53,"onsitePercent":55,"contractType":21,"foundAt":214,"category":215},11941,"dmu-engineer-digital-mock-up","DMU Engineer (Digital Mock-Up)",[201,202,203,204,205,206,207,208,209,210,211,212],"Digital Mock-Up (DMU) Management","3D Produktintegration","Clash & Clearance Analysis","Interference Management","Space Allocation & Packaging","Elektromechanische Integration","Siemens NX","Teamcenter VisMockup","CATIA","PLM-Systeme","Weight & Balance","Center of Gravity (CG)","6 Monate","2026-06-09T15:30:17+00:00",{"id":24,"slug":25,"label":26},{"id":217,"slug":218,"title":219,"skills":220,"budget":53,"duration":53,"location":226,"onsitePercent":141,"contractType":21,"foundAt":227,"category":228},11936,"konstrukteur-mwd-maschinenbauverfahrenstechnik","Konstrukteur (m\u002Fw\u002Fd) Maschinenbau\u002FVerfahrenstechnik",[76,163,77,221,44,222,223,224,225,46],"Autodesk Inventor","EPLAN","MS Office","Sondermaschinenbau","Technische Zeichnungen","Cuxhaven, Niedersachsen","2026-06-09T15:26:49+00:00",{"id":24,"slug":25,"label":26},{"id":230,"slug":231,"title":232,"skills":233,"budget":53,"duration":53,"location":238,"onsitePercent":141,"contractType":21,"foundAt":239,"category":240},11933,"technischer-konstrukteur-mwd","Technischer Konstrukteur (m\u002Fw\u002Fd)",[234,235,236,77,16,98,11,237],"Apparatebau","Druckbehälter","Schweißkonstruktionen","DIMY","Oyten, Niedersachsen","2026-06-09T15:26:24+00:00",{"id":24,"slug":25,"label":26},{"id":242,"slug":243,"title":244,"skills":245,"budget":53,"duration":53,"location":254,"onsitePercent":141,"contractType":155,"foundAt":255,"category":256},11930,"stellvertretender-fertigungsleiter-mwd","Stellvertretender Fertigungsleiter (m\u002Fw\u002Fd)",[246,247,248,249,250,251,252,136,253,150],"Fertigungsplanung","Fertigungssteuerung","Produktionssteuerung","ERP-Systeme","Kapazitätsplanung","Arbeitsvorbereitung","Materialflussplanung","Logistik","Neunkirchen, Saarland","2026-06-09T15:26:01+00:00",{"id":24,"slug":25,"label":26}]